Laserfiche WebLink
12. Difficulties or Hardship to Owner: <br />Due to a lack of communication between owner and Village <br />of Roseville building inspection office, �there are now I1 posts <br />imbedded 2 feet ir� cement, standing 6 fee�: high. Owner was not <br />informed of stipulations ror corner lot on 2 different occasions <br />when calling building inspector, <br />A desire for backyard privacy and screening eff the traffic <br />on Brooks Street pre�empted the fence. Traffic on Brooks will <br />continue to increase as outlets onto Snelling Ave, will be closed <br />off �aiCh the building of interchan�e at Co. Rd. B2 and Snelli.ng. <br />Brool:s will th�n be one of two streets, the other being �extent, <br />that wi�l take traffic out to Ham:ine Ave. <br />.;� <br />