Laserfiche WebLink
<br />minimum use of the System. If service is interrupted for a total period of more <br />than forty eight (48) hours in any thirty (30) day period. Subscribers shall be <br />credited pro rata for such interruption. <br /> <br />4. Technical Standards. The technical standards used in the operation of the System <br />shall comply, at minimum, with the technical standards promulgated by the FCC <br />relating to Cable Systems pursuant to Title 47. Section 76.601 to 76.617, as may <br />be amended or modified from time to time, which regulations are expressly <br />incorporated herein by reference. <br /> <br />5. Special Testine. <br /> <br />a. The City shall have the right to inspect all construction or installation work <br />performed pursuant to the provisions of the Franchise. In addition, the <br />City may require special testing of a location or locations within the System <br />if there is a particular matter of controversy or unresolved complaints <br />regarding such construction or installation work or pertaining to such <br />location(s). Demand for such special tests may be made on the basis of <br />complaints received or other evidence indicating an unresolved controversy <br />or noncompliance. Such tests shall be limited to the particular matter in <br />controversy or unresolved complaints. The City shall endeavor to so <br />arrange its request for such special testing so as to minimize hardship or <br />inconvenience to Grantee or to the Subscribers caused by such testing. <br /> <br />b. Before ordering such tests, Grantee shall be afforded thirty (30) days <br />following receipt of written notice to investigate and, if necessary, correct <br />problems or complaints upon which tests were ordered. The City shall <br />meet with Grantee prior to requiring special tests to discuss the need for <br />such and, if possible, visually inspect those locations which are the focus <br />of concern. If, after such meetings and inspections, City wishes to <br />commence special tests and the thirty (30) days have elapsed without <br />correction of the matter in controversy or unresolved complaints, the tests <br />shall be conducted at Grantee's expense by a qualified engineer selected by <br />City and Grantee, and Grantee shall cooperate in such testing. <br /> <br />6. Drop Testine and Replacement. Grantee shall insert a 750 MHz carrier at a level <br />IOdb below the video carriers that will be measured by Grantee as a normal <br />procedure during all service calls. In addition, the Drops and related passive <br />equipment will be inspected during Installations to assure that the Drop and passive <br />equipment can pass the full 750 MHz System capacity. In the event measurement <br />of the carrier or the inspection demonstrate that a Drop or associated passive <br />equipment do not pass the full 750 MHz, the Subscriber address will be recorded <br />by Grantee and Grantee shall provide City, or its designee, upon request a report <br />indicating the addresses where Drops or associated passive equipment have failed. <br />Grantee shall replace all failing Drops and/or associated passive equipment at the <br /> <br />13 <br />