Laserfiche WebLink
<br />EXHffiIT C <br /> <br />Description of Work <br /> <br />Engineering Walkout <br />Engineering Design <br />Commerce Permitting <br />Fiber Optic Cable and Node Installation <br />Amplifier Replacement <br />Passive Equipment Replacement <br />System Balancing and Proof-of-Performance <br />Activation in Phases; Completion By <br /> <br />. <br /> <br />Time Frame <br /> <br />0-6 months <br />2-8 months <br />Day 75 <br />11-16 months <br />12-24 months <br />18-36 months <br />36 months <br />November 30. 2000 <br />