My WebLink
|
Help
|
About
|
Sign Out
Home
pf_00400
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF001 - PF999
>
400-499
>
pf_00400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 11:05:01 AM
Creation date
2/9/2016 12:46:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Oc tober 3, 1 �b7 <br />CASE� <br />LOCAT I GN : <br />� <br />� � <br />� � <br />400-b7 - Rosevilie Funerol Home <br />a01-a7 - Shdkee�s P�=Za <br />t�orthwest Co�r�er of Caunty Road C-2 and Snelling <br />Avenu� <br />ACTION REG�UESTED: Rez�ing for Shokee's Pizza from "B-2" to "�-3" <br />�nd a Sp�cial Use Permit for the Ros�ville Funerol <br />Home <br />PIANNING CUNSIDER�TIONS <br />i. To the left a�e copies o� the sketches i�dicating the proposed Ic�cations for the two <br />developments in the area in the northwest quadrant of Sn�lling Avenue and County <br />Rood C-2. At the lost heoring of the Planning Commissior�, �he Nighway Department <br />r�spresentatives indic�ted their concern regarding the accommodation af �n ultimate <br />it�terchange in the uicinity uf C�unty Road C-2 and Snelling Avenue. At our recent <br />me�eting with the Highway Department, it w�s ascerfiained thot an interchange at <br />County Road C-2 would require all or p�rtions �f bath par��els involved in thi3 <br />quodra�nt. It is ther�Fore essential to ascertain in tHe immedia�� iutu�e whether Yher� <br />wil) be an intefchange a� County Road C-2 and the areas of land required fo� its <br />ultimat�e construction. There is o question as to wfiether or rooY an intercha,�ge at <br />County Road C'-2 couid be replaced by such c� structure fu�ther narth at Lydia Avenue . <br />2. We are meeting again with the H�ghway D�p�rtrnenF �n Monelay to consider further <br />details and the pros cnd cons nf these lo��tians. <br />r` 3. It shoulsl be our objective to determine the co�rect locafioon for the interchange and <br />its basic design as soon as pcxsible so as to minimize any advers� aft��, t on dev�Eopment <br />. potential in the immediate area. <br />: :� <br />
The URL can be used to link to this page
Your browser does not support the video tag.