My WebLink
|
Help
|
About
|
Sign Out
Home
pf_00500
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF001 - PF999
>
500-599
>
pf_00500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 1:39:52 PM
Creation date
2/9/2016 12:47:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />� <br />24055�24 <br />� <br />24055a25 <br />24055.26 <br />`r 24055.27 <br />� <br />� <br />� <br />24056� <br />24056.1 <br />� <br />dirt trom �nt�ring the j�inc space. <br />Preventing Tren��h W�rer from Entering Pipe: All openings along the line of sewer< <br />shall be secure?y clo=ed, as directed, and at the suspensi�n of work at any time, <br />suitable st�ppers sha11 be placed to prevent earth or other substances from enter- <br />ing sewer. <br />Bell Ends to Face Direction of Laying: Pipe laying shall proceec� upgrade with <br />spigot ends pointing in the 3ireccion of flow. <br />Railroad and Highway Cr��ssing: tdhen any railroad or trunk highway is crossed, <br />all precautionary construction mea�ures required by the agency issuing the permit <br />therefor shall be followed. See "Special Provisions" ar Detail Drawings. The <br />Owner shall be re�ponsible for the securing vf necessary cr�ssing permits, and the <br />Contractor shall give not less than 15 days notice in writing to the Engineer before .� <br />the crossing is made� Railroa.d or highway crossings shall be paid for as a separate <br />item, and consr_ruction requirements shall be as stated in the "Special Provisions". "''' <br />Unsuitable Conditions for Laying Pipe: No pipe shall be lai_d in water, or �Jh�n the ' <br />trench conditions are unsuicabLe for such w�rk, except by pE:rmission of the Engineer.;.�: <br />JOINTING: ' <br />;:; ;'� <br />Pr��cedure: Joincs for vitrified clay or cast ir�n pipe shall first be centered by <br />thE lse of ane or more rings of c3rred oakum, After placement of pipe, a joint <br />sha �1 '�e made �hat fills rhe complete annular space, flush cvith the e�ds of the <br />be11. Joint filler shall be af material specified in the "Special Provisions". ': <br />Paured type joints shall be placed in one operation and not as a saries of paurse <br />24056.2 Cement Mortar Joints: If cement mortar joints are specified in the "Special Pro�- <br />visions" and mcrtar shall be relatively stiff and shall be composed of one part <br />Portland cement and one and one-half (1-1/2) parts of clean sand with only enough <br />water_ added to gEt pr�aper cansistency, Joint material shall completely fill the <br />joints so that when th� pipes are shoved together, the material will be forced <br />out th� edges of the joint entirely around the pipe. <br />After joints are made, any superfluous material inside the pipe shall be removed <br />by means of az appreved follo�aer or scraper. All joints must be water-tight and <br />any leaks or defects discovered must b� immediacely repaired. Any pipe which has <br />be�n disturbe.d after being laid cnus� be taken up, th� joint cleaned and properly <br />relaid as directed by rhe Engineer. <br />Joints connecting cast iron pipe �aith concr�te or clay pipes shall be made with <br />� a c�ncrete saddle completely surrounding the joint in accordance with the "Special <br />Provis'.ons" or detail dra�aings. Lead joints in bell and spigot cast iron pipe <br />shall be at least two inches in depth an� thoioughly caulkede <br />r24056.3 <br />' 24056.4 <br />� 24056.5 <br />, <br />Cold Tr�welled Joints: Jeints stlall be made as outlined for Cement riortar Joints <br />in Section 2�056 2. <br />Hot p�ured Joints: Hot poured joints shall be made using material specified in <br />the "Special Provisions" or "SpPcific Reyuirements". Suitable runners or paper <br />gaskets or rings shall be used to h�l.d the material in the bell until it has caoled. <br />Rubber Gasket Joints: Rubber gask2t .�oints shali be furnished for a.11 concrete <br />pipe as stated in r_he "Spec_�.al P,�v�sions" or "Specific Requirements", and in- <br />24000 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.