My WebLink
|
Help
|
About
|
Sign Out
Home
pf_00500
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF001 - PF999
>
500-599
>
pf_00500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 1:39:52 PM
Creation date
2/9/2016 12:47:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�I <br />� 24059.6 Ueficiency of Backfill, Sy ihrham Supplied: An_y deficiency in ihe quantity of <br />material for backfillin� the trenches, or for tilling depressions caused by <br />settlemenL, shall be supplied by the Contractor. <br />� 24G59.7 <br />� <br />F <br />24059.5 <br />24059.9 <br />24060. <br />L':� 1 <br />�� <br />Restoration of Surface• When T "" b kf`11' <br />. ype a ac i ing procedure is used, cxc�ss <br />dirt shall be neatly rounded over the trench to a sufficient height to allo��r <br />for settlement to grade arter consolidation. Only excess dirt equivalent to <br />displacement by structures shall be removed by the Contractor a5 specified <br />in the "Special Frovisions". <br />k�hen Type "b", "c" or "d" l�ackfilling procedure is required, the street shall <br />b� e 'a <br />r tur:zed to it <br />s ori i.na:L rade n <br />a d contaur <br />a A <br />� g z�y excess dirt caused by c�is- <br />placer�ent due to structure;> shall be removed by the Contracfior to a l�cation as <br />desi.gnated in the "Special Provisions". These specifications do not protTide for <br />restoration of original surfaces nor any surface whatsaever, unless th� construc- <br />tion requirer�ents, materials, e�c., are stated in the "Special Provisions" and <br />a basis of pay provided in the "Proposal". Such "Special Provisions" shall <br />designate streets, construction type of surfacP, and shall be bid by the linear <br />foo� of trench. <br />Cleaning Up: Su�plus pipe line material, tools, and temporary structures shall <br />be removed by the Contractor, and all dirt, rubbish, caizsed by his operations an�I <br />excess earth from excavations shall be hauled to a dump provided by the Contractor '� <br />and the construction site shall be left to the satisf.action of the Engineer. <br />Infiltration in Sewers: <br />Description of Test and Allowable Leakage: Upon completion of the sewer construc- �� <br />Cion and befare any house services are connected, leakage tests shall be made to <br />determine the amount of ground �aater infiltration into the sewers. Measux�ments .';'3 <br />wi�l be made by means of '�0 V-Notch wires placed in the lines. Measurements shall <br />be taken at al1 points �ahere, in the opinion of the Engineer, the flow of water in <br />the sewers is greater than the maximum allowable leakage. <br />The mahimum allowable rate o£ leakage sha.11 be as stated in �allons per inch di- ��' <br />ameter of pipe per mile tor 24 hours� <br />In case measurements indicate a leakage greater than the maximum allowable leakage <br />at the outlet of ne�o construction, additional measurements shall be taken and con- <br />tinued unti.l all lealcs are located and the necessary repairs and corrective work <br />have reduced thE le�lca�e �n the section bein� tested belo�v the maximum allowed by <br />the sper_i.ficat:ions. <br />The Contractor sh�ll f ur�i isi� �h._ �.,��� �, �; :�nci r�ther material and the labor for placing <br />the weirs i.n the Set,�ECS, .+R�I �,h., l l ,��:- ��t the En�ineer in making the measurements. <br />The Contractor shall r��� f� ivr n�� .�Jd �t <<�r<<�l �_c>mpensation for making the leakage <br />tests or corrective work ne�:.,:�;�,,, •,� ��, � e�i��ce leakage belo�a the maximi.�m allowed <br />by the spec if ica t ic�n ,. <br />Guarantees• <br />24061.1 General: The Contractor shall be held responsible for anv and all defects in work- <br />manship 1nd materials �,��hich may be devel�ped in any part of the entire installation <br />furnished by him ot}�er t11an street surfaces, and upon wriLten notice f.rom the Engi- <br />neer, shal.l immediately replace and malce �ood without expense, to the Oconer any <br />such faulty part c�r pares and damage done by reason of same, during the period of <br />one (1) year from Lhe dzte of. final acceptance of the installation. <br />� 24000 - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.