Laserfiche WebLink
0 <br />23002�8 <br />� <br />GATE ��AL��S : Ga �� va ? ves sha 11 be bronze mounted ; iron body va Ives confornting <br />with the requiremen�s of the "A.W�TdaA. SPECIFICATIONS" and for cc�nnections as <br />s ta �e d in th� "SFEC L�,L REQU IREriENTS �" <br />23002.9 ��ALVE SOXES: ��alve box-es sha11 be cast iron, adjustable type, conforming wi�h <br />the requirem�nts of �he "A.W.W.A. SPECIFICATIONS." Valve boxes shall b� con� <br />sidered integral units, whethEr 2 or 3 unit type, and for depth of bury .es <br />�tated in the "SPEGIAL PROVISIONS�" <br />23002,10 COPPER SERVICE PIPE: ��opper service pipe sha11 be seamle:ss and suitable <br />for use as u�derground service �onnections. Copper tubing shall conform to <br />"A . S. T,�i . CLASS K SPEC I FICATIONS", and "U . S. GOVER�'�i�iENT TYPE K SPECIFI�ATIt�NS <br />WW��-799", size shall b� noteci in the "SPEC LAL PROVISIONS." <br />23002,11 CUR� STOP AND BOX: Cu:b stop shall b�e for copper service pipe inlet and <br />outlet and boxes shall �e approved extension service boxes of a unifarm <br />make. Inside diameter ��f upper section shall be standard for curb stAP �with <br />wnich it is to be used. <br />23002 .12 CORPORATION COCK: Corp��ra tion cock sha 11 be "Mueller No . 15000" c�r appr��ver3 <br />equals threaded for use with copper service pipe of size specifieci, and <br />thread on inlet end witl� standard corpo•ration cock thr�ead. <br />23050. <br />23C�5I . <br />23051.1 <br />23051.2 <br />CONSTRUCTION REQU IREi�1EN7'S : <br />�tdSPE�TION <br />OF PiATERIAL AT DELiVER'i PQiNT; During the process of unloading� all pipe and <br />accessories �hall b� inspected �y the Contractor f�r Ioss or damage in tramsita <br />FIELD INSPEGTI�N: All �ipe and accessories shall be lafd, jaint�d, �isinfected, <br />amd �ested for defects and l�ak�ge, in the manner herein specified. <br />23051.3 DI�POSITI�N �!� DEFECTI�TE i�iATEITIAL: A11 materi,al Euund duri.n� the pragress of <br />th� wark Co have cr�cks, flsws, ar ott�er defects will be rejected by the <br />Eragine�r, and the Contrector sha1Y promp�ly rernov� from tt�e siCe ai the w�rk <br />suce� defectiv� matQrial. <br />� 2�052. CONTRACTOR'S itESPt�;��Ig3�I,ITY �'pR �IA'rgRlpLo <br />� <br />� <br />� <br />C <br />23052.1 RESPONSIHIL7't�' F�►R �1A1'ERIAI. FLiR\I5}i1;D li�' COI�'TI�AC'fOR: 'I'h� �Contractar �hall be <br />responsible fnr a11 mat�rial furnish�d by him end he shAll regl�c� at his otat� <br />expens� all sUch maceria? thac is found ta be d�f�ctive in a►anufacture Qr ti7at <br />has become damaged in hand�ing a�'ter dElivery t�y ttie mAnufacturer. This <br />shall incli,de the �Uli11S}11I1t; oi a�l material �nd labor ;equire� f�r ti�e <br />replacemenC ��f ir�stalled rna�exial discc�vered de�ecLive� prior to Chc Cinal <br />aGcepiance ���� the w�z�k. <br />23052,2 RES}'ONSIIi1T,T'f�' F�OR �iA'I'LR1A1� I�!'1?NIS}iE� li�' pw�'ER: °Ihe Contres:Cor's r�spansibilfty <br />for ma ter ia 1 furn i shed b�• t}�e ��rner sha 11 bebin a t ttle pui nt of de l ivery by the <br />manufacturez, o�• ,_�wner, and tipon accepCanec ar the materiar by che Cuntractor. <br />Tlie C:�ntractor shall examinc a1l material fur��ished b�� �he (�w�ier �t the time <br />and place oi� deliver��, and she11 reject a11 def�ective :naeerial. The poinC of <br />de J. ivery sha 1 1 bc s Za t ed i�� tl;e "SPI:C: lAl. PhO�' 1S IOh'S ." <br />� 23000 - 2 <br />