My WebLink
|
Help
|
About
|
Sign Out
Home
pf_00500
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF001 - PF999
>
500-599
>
pf_00500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 1:39:52 PM
Creation date
2/9/2016 12:47:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />to p�'ovide a clearance ot aL le.ast 6 inches below outside barrel of the �ipe, <br />valves, or fittings, and to a clear width of 6 inches on each side of all pipe <br />and appurtenances ior pipe 16 inches or less in diame�er; for pipes iarger than <br />16 inches, a clearance of 9 inches belo�.� and clear �ai�3th ot 9 inches on each <br />side of inside diameCe.r oi pipe st�all be provided. ,��dequate cleararice for pro- <br />perly jointing piQe laid i.n i�ock trenches shall be pr��vided at be11 holes. <br />23Q55.7 PIPE FOUNDATION tN KOCK: The spdce �etween the bottcrm of Lhe trench and. rock and <br />the bottom �i the pipe shall be backtilled with suit�ible ma.terial LhorotGghly <br />tamped. Gener�al speaking, the material zrom the tren.ch excavation, othF:r than <br />rock or boulders, sha11 be �_onsidered as suitable mat:erial. No additioiia� com�- <br />pensation far placing or tamping this material shall be allowed HowevE�r, in the <br />event that the "SPECiAL PROVISIONS" do not specif ica:I.Iy provide othercai;�e, addz- <br />tional compensacion shall 'oe only tor the hauling ii:� the material to tlne top of <br />the trench and shall ziot iriclude any extra compensation for placing and tamping <br />of the materidl in thE� trench. Hauling ot the matertal sha11 be paid for as <br />specified in the "GENLRAL �OI�'DITIONS" under unclass:ified work or. as directed in <br />the "SPECI,AL PROVISIONS . <br />23055.8 SUB-GRADE IN ROCK TRENCH: Excavations below sub-grade in xock ar in ��oulders <br />shal.l be r.efilled to sub-grade with approved material, thoroughly compacted, <br />Hauling and placing of such �pproved material shall be paid ror as specified <br />under uilclas�ified work or as directed �n che "S�'ECIAL PROVISIONS". <br />23055.9 SOLID ROCK EXCAVATiON DEFINED: Solid iock excavation shall include such rocks <br />as are not de�omposed, �aeather�:d or shattered and whic.h will require blasting, <br />Uar.ring, wed�ing or use of aii tools �.or removal. Under this classification <br />shall be included the removal o.t any concrete or masonry structure (except <br />concrete pavement, cucU, gutter and s�.dewalk) exceeding one-quazter (1/4) cubie <br />yarcl in volume that mav� be encauntered in i:11P_ work. <br />23Q55.10 LOOSE RQCK EXCAV�IT.LON DE�INED: Loose rock shall include all stratified rock, <br />slide rock, sanclstonE, cemented gravel, shale and boulders not other�oise defined <br />as solic3 rock, regardle5s of ho�a removed. <br />23055.11 BLASTrN� PROCI;DURL: The hours of blasting will be fixed by the Engineer. ThP <br />Cont.ractor's meti�od of proced��re relative to blasting shall conform to local <br />� and state laws and muni��i a.1 ordinanc_es, <br />23055�12 BR�1CI:'D AND SHT�C?TI.NG 1'RI:\CFIE:�: lti'1lerever neceasary to prevent caving, excavations <br />in san�l, �ravel sandy s:>il, or ocl-�er unstable material shall be adequately <br />s�ieeted and braced , lti'hec e sl�eet ing and bracing are used, the tr.ench width shall <br />be increased a�c��rdLI1i;L\'. 'Trench 5heeting shall remain in place until pipe has <br />be�i� laid, t�s�ed � �r u�t t� �:� ����1 rtPa Li Pd it necessary, and the earth around it <br />c��mpacted Lo .� deptli of une i��ot ��ver che top of the pipe. Sheeting ordered <br />lef�t in pl.i�e s}i�ill he p��id i o: �it tlle un�.t price bid. <br />73a55.13 `tANNER OF PI.I..I\G 1?.l'Cr1�'�'1"f[;ll `1�1'I'l:hl��L: A].1 excavated material shall be piled in <br />a❑latl[1�� th<+t �ti�ill I1i�C eilcl.�n�,cr the �aorl: ;�nd that will avoid obstructing side- <br />�,��31ks ac�d dr.�1.��i:w:i��ti Gu�t��r5 sh,�11 1�� kepr_ �lear or ocher satisfactory provi- <br />S1ot15 tnadC i(>;' sttc�ct tlr���l.n<;�;C. <br />23055.1.4 b....itLCElU1:5, GUAI�.11S :1'�l) ti�"+I�f:'I�1' NR��\'L:�1ONS: I'o pro�ecc. persons irom in�ury and to <br />nvo_�cl pr��p��rt�� �i��m�tsr,��, ,��i�'cl��'t� h��rri�<+des, construction signs, [,orches, red <br />� 3Ol)O - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.