Laserfiche WebLink
�� <br />� <br />� <br />� <br />� :.. <br />iy <br />� <br />� <br />� <br />� �.� <br />G; <br />�� <br />��� <br />L:J <br />!� <br />� <br />� <br />� <br />� <br />discrepancies, the documents shall be given precedence in the following ,. <br />order: Agreement, Specifications, Drawin�s. 6•Jithin the Specifications <br />the order of precedence shall be as folloHrs: Special Conditions, <br />Instructions to Qidders, General Conditions, Technical Provisions, <br />Futur.e dimensions on Dra�rings shall govern ov�r scale dimensions, and <br />detai 1 ed Drat�vi r�gs shal l go��ern over general Drawi ngs . Any work that <br />may reasonably be inferred from the Specifications or Drawings as being <br />required to produce the intendec� result shall be supplied whether or not <br />it is specifically called for. ��Jork, materials or equipment described in <br />words which so applied have a well-kno�rn tecf�nical or trade m�aning sha1i <br />be deemed to refer to such re�ognized standards, Th� CONTRACTOR assumes <br />full responsibility fGr having familiarized hims�lf with the nature and <br />extent of the Contract Documents, l�Jork, Locality, and local conditions <br />that may in any manner affect the l�lork to be done. <br />ARTICLE 5- OI�JNERSI-iIP ANO COPIES OF DOCUP•1EflTS; "CONSTRUCTION RECORD DRAt�JINGS" <br />5.1 Al1 Sp�cifications, Draa�ings and copies thereoi furnished by the <br />ENGINEER shall remain his property. They shall not be used on anather <br />Proj�ct, and, with the ex�eption of those sets which have been signed in <br />connection with the �xecution of the Agreement, shall be returned to him <br />or� request upori completion of the Projec�:. <br />5. 2 The 01�liVER ►�ri 11 furni s!� to the CONTRACTOR up to t�n copi es of th� <br />Specifications and Dra��rings as are reasonab�y necessary for the execution <br />of the ldork. �dditional c�pies tiviil be furnished, upon request, at the <br />cost of reproduction. <br />5.3 The CONTRACTOR si�all keep one copy of al7 Spe�ifications, Qr•awings, <br />Addenda, hrlodifications, ar7d Shop �rawings in good condi�ion a� the site <br />which shall be annotat�d to sho�v all changes rnade during thie construction <br />process. These si�all be availabl� to the E�lGINEEH and shall be delivered <br />to him for the UlAIlVEF� upon �oi��pletion of the Project. <br />ARTICLE 6- l�lORK QY QTNERS <br />6.� TIIP, OIJNER IlliiJ/ p�?i-form additinnal ��iark i`l,�ted to the Project by ��im- <br />self, pr Ite may let r�ti�e►• direct cc�ntracts therefor ���hicli shall coiltain <br />General Conditions similar to these. The GON1'RAGTOR sh�ll �fforc! the other <br />contrac�ors ��f�o <�re parties co such direct contracts (or the OI�NER, if he <br />is performing the add7tioiial work hims�lf}, reasonable op�ortunii;y for the <br />introduction anc� sto►,age of m�t�rials anci ec�uipment and th� execution of <br />tvork, �nd shall properly connect and co-crdinate his tiork d�rith theirs. <br />6.2 If any p�rt of the CONYRACI�QR'S l�lork dc�pends, for proper ex�cution <br />or results, u�on th� ti��ork of any sucl� oth�r coritractor� (or the C�!!�JER), the <br />CONTRACTOR sl�al l ir7spect and prom��tly repc�i�t �� the E��GI���ER in ���ri ti�ig <br />ar7y de�fects or det� i ci enci es i n such lJo�•k thai render i� UIISU 1�dU� � for <br />such proper execution and results. <br />G-4 <br />