My WebLink
|
Help
|
About
|
Sign Out
Home
pf_00500
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF001 - PF999
>
500-599
>
pf_00500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 1:39:52 PM
Creation date
2/9/2016 12:47:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br />' <br />7 lin.ft. Std, MH in exc.ess of 8' deep @ <br />& /100 DOLLARS $ /l.f. <br />12 each 4" on 8" V.C. Wyes in place @ <br />& /100 DOLLARS $ /ea. <br />$ <br />500 lin.ft� 4" C.I.S.P. Services toward <br />property line (d <br />& /100 DOLLARS $ /l.f. $ <br />100 cu.yds. Crushed rock in place for <br />Pipe Stabilizatian @ <br />& /100 DOLLARS $ /c,y. $ <br />2 each Cut-in to inp,lace <br />Sanitary Sewer @ <br />_ & /100 DOLLARS $ /ea. <br />TOTAL $ <br />—� <br />� x <br />The finaZ amount a� the contract for this project shall be determined by multiplying the <br />f inal measured quantities of the various it�ms by the unit prices stated therefor in the '�' <br />manner prescribed in the specificationsa However, the low bidder sha11 be determined by <br />�� adding the sums resulting from multiplying the �uantities stated for this pro,ject by <br />the unit bid therefor. <br />� If awarded this contract, I/c�ae agree to start and complete wo�k according to the following ; <br />schedule: <br />� <br />� ; ;�i <br />START WORK (DATE) COMPLETE WORK (DATE) ',' <br />AS SPECIFIED <br />=�e�eompan�ing this bid is a(bidder's bond) (certified check ,� � <br />)(cash deposit) in the amount <br />Qf DOLLARS CENTS ($ � <br />which is at least ten per cent (10%) of the amount of my/our bid made payable to: Mr. <br />Norman J. Tolstad, and the same is subject t.o forfeiture in the event of default on the <br />part of the undersigned or failure on the part of the undersigned to execute the prescribed ` <br />contract and bond within fifteen (15) days after its submittal to me/us. <br />The undersigned is familiar with the "TIME OF COMPLETION" requirements of the S e°f' <br />p ci ica- <br />tions, both for individual sections and the entire project, <br />`, In submitting this bid it is understood that payment will be by cash or check. <br />� <br />l� <br />It is understoud that bids may not be withclrawn for a period of thirty (30) days after <br />the date and time set for the opening of bids.- It is understood that the Owne� reserves <br />the right to retain the certified check or bond of the three lowest bidders as determined <br />by the Owner for a period not to exceed thirty (30) days after the date set for the open- <br />ing of bids. <br />P - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.