My WebLink
|
Help
|
About
|
Sign Out
Home
Planning Office Hours 1983-1985
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
1983-1993 Correspondance and Office Hours Records
>
Planning Office Hours 1983-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 4:20:27 PM
Creation date
2/9/2016 12:55:27 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />U <br />• April 24, 1984 <br />-6- <br />Mr. Lofstis informed us tliat the arcliitectural firm of Korsunsky Krank had <br />been retained to do tl�e arcliitectural work. This fact we found encouraging <br />inasmucli as Korsunsky Krank is considered one of the best architectural firms <br />in tlle metropolitan area, parfiicularly as it relates to retail centers. <br />Our next step is to proceed witl� the credit check and meet with the architects <br />t�� xeview preliminary site plan concepts and criteria. <br />15. Kotoski - 483-97G7. Dick Kotoski came in to acquire about tl�e possibility af re- <br />zoning land several lots north of Lake Ridge Nursing Home at the northwest co2°ner <br />of Woodhill and Victoria. We in�ormecl liim that a rezoning to multi-family would <br />constitute a spot zoning, but tliat a duplex mig}it Ue proposed on any one of these <br />lots that zre inordinately large, and with fr�ntage on Victoria. <br />� <br />�J <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.