My WebLink
|
Help
|
About
|
Sign Out
Home
Planning Office Hours 1989-1991 Dahlgren
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
1983-1993 Correspondance and Office Hours Records
>
Planning Office Hours 1989-1991 Dahlgren
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 9:11:18 AM
Creation date
2/9/2016 12:56:40 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
565
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br />ROSEVILLE OFFICE HOiTRB 4/17/31 2 <br />We made a list of speci�ic items affected by the zoning standards <br />and how we might address them in the Special Use Permit: <br />No� Debatable <br />Storm Drainage <br />Paving, Crarbing <br />Mo�t Setbacks <br />Niost Landscaping <br />Flexible Timincx <br />Prior, Arthur: <br />Se�backs, Landscaping <br />Variance Possible <br />Parking in <br />�Co Rd C Setback <br />Bldg Materials <br />National's vice president, Jim Smith, said he cTicln't think there <br />was anything on the list that couldn�t be worked out. '.�hey will <br />be back wit� a more speci�ic proposal, <br />2. Bill Franke, Everest Group (636-5500) <br />Scott Nelson, Dovolis-Johnson Archts (871-6009) <br />Bill and Scott came in to show us preliminary architectural <br />sketrhes for Everest's proposed development on the tr�o sites south <br />of County Road C on either side of Long Lake �2oad: the Ruan site <br />and the Thoraldson site. The project would con�ist of a one-st4ry <br />building on each of the two sites and is an extension of their <br />Rosedale Corporate Plaza north of County Road C and would be <br />sim�.lar zn appearance and use to those office and office/showroom <br />buildings. <br />Issues we thought would be important tu resolve are: building <br />materials and architectural �r�atment on all sides of the <br />buildings, landscaping, screening of lQading ,�reas, grading and <br />drainage, and signage. There is a pipeline easement oz� the <br />Thoraldson site and an NSP easement on the Ruan site, but the <br />drawings indicated they are working within those constrain�ts. <br />3. John Pavlick (487-2847) <br />The owners of Ole Mexico restaurant want to add <br />outdoor seating area to their b�ilding. Tl�e project <br />seats. Rick indicated the praject cou].d <br />administratively if parking is sufficient, which it <br />is. <br />4. Bruce Co�.on (452-7312) <br />a canopy and <br />would add 32 <br />be approved <br />appears there <br />The owners of the Paragon office building on Snelling Avenue north <br />of County Road C want to build a sidewalk and steps betraeen their <br />site and the adjacent Cattle Co. restaurant. The project will <br />invalve relocating some landscaping and has the approval of bot� <br />property owners. The proje��t can be handled administratively. <br />5. Joyce Nordquist (782-0614) <br />Joyce wants to build a house for a client on the vacant lot at 2972 <br />Old Highway 8 in the NW corner of the city. She is requesting a <br />side yard setback variance to 5' instead of 10'. Her rationale is <br />� <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.