My WebLink
|
Help
|
About
|
Sign Out
Home
Planning Office Hours 1989-1991 Dahlgren
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
1983-1993 Correspondance and Office Hours Records
>
Planning Office Hours 1989-1991 Dahlgren
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 9:11:18 AM
Creation date
2/9/2016 12:56:40 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
565
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMOItANllIIM <br />� DA.TE: 19 October 1990 <br />TO: Steve Sarkozy <br />FROM: John Shardlow <br />SUBJECT: PLANNING OFFICE HOURS, October 3, 1990 <br />1. Tom and John Willmus <br />On August 15, John Willmus had attended an office hours <br />appointment to discuss the location for an automatic teller <br />machine on the bank property. We had identified a number of <br />].ocations where such a facility could be placed on the property <br />without disrupting the circulation or parking design. However, <br />they had decided to submit plans that did not coincide w�ith the <br />direction that was given to them at the office hours apr�ointment <br />and, as a result, they received a negative planning report. This <br />item was scheduled to be heard by the Planning Commission this <br />evening (October 3rd, 1990). After discussing this matter at <br />some length and visiting the bank property with Mr. Willmus and <br />Council Member Thomas, we returned and agreed to a modificati�a� <br />of their proposal to insure that the traffic using the ATM would <br />not be in conflict with normal bank circulation. <br />� 2. Dale Brown, IDS Financial Services <br />Mr. Brown was in to review the zoning and building code <br />compliance issues related to the reconfiguration of the office <br />spac� at the building owned by Everest and leased to IDS in the <br />northwest quadrant of County Road C and Long Lake Road. The <br />office spaces for IDS on the second floor of this building had <br />been very intensely laid out and there w�re a number of fire code <br />issues related to the �entrances and exits when�the project was <br />initially approved. We reviewed these,�issues and talked about <br />the various levels of concern related to a series of. potential <br />future scenarios, including the subl�as� of the space to another <br />entity. After receiving this informa�ion, Mr. Brown agreed that <br />they would decide as a company which of these scenarios they <br />would like to pursue, and return to talk with us about how �o <br />proceed. <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.