My WebLink
|
Help
|
About
|
Sign Out
Home
Correspondence 1988 Jopke
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
1983-1993 Correspondance and Office Hours Records
>
Correspondence 1988 Jopke
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 4:12:25 PM
Creation date
2/9/2016 1:00:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M E M O R A N D U M <br />� <br />DATE: September 1, 1988 <br />TO: Planning Commission Members <br />FROM: Rick Jopke � <br />SUBJECT: Update Planning File 1869 Gem Ifo� SamPUD5 car�wash and <br />approval of Special Use Permit <br />self storage. <br />The Planning Commission has previously recommenbudldinlamaterials <br />request because of concerns about the exterior g the applicant <br />and drainage. At the city council meetin , <br />requested that the council not take action so tha t they a could <br />refer it back to the Planning Commission uestions. <br />resolve the exterior building material and drainage q <br />The City Council referred this matter to th�isedt materi ls �which <br />Commission meeting. Attached are the re <br />have been received concerning this matter. <br />The Rice Creek Water Management Board has apparently approved <br />this request with the following conditions. <br />1. That the skimmer be redesigned in accordance with their <br />� requirements. <br />2, That the inverts be verified at the rt isting trench piping <br />system that exists off of the�.r prope y. <br />The applicant has agreed take care of these conditions. The City <br />Engineering staff has some remaining concerns relating to the <br />fact that there would be poncling against the building, and that <br />some slopes are too steep. <br />The applicants have provided additional�e thatL a c mbinat�onsof <br />exterior bui l d i n g m a t e r i a l s w h i c h �. n d i c a <br />brick an d bric k embossed concrete woul�a be ofr�theseh materials� <br />drawings show the location and percen g <br />The applicant has also submitted colodinhst�g These picturesswi11 <br />brick embossed concrete on other buil g <br />be available for commission review at the September 7 meeting. <br />L� <br />
The URL can be used to link to this page
Your browser does not support the video tag.