Laserfiche WebLink
� <br />LJ <br />M E M O R A N D U M <br />DATE: September 14, 1990 <br />TO: Steve Sarkozy <br />FROM: Rick Jopke <br />SUEJECT: Roadway Easement <br />'" :ase execute and have the attached easement agreements <br />notarized. This easement was required as a condition of the <br />approval of tne variance for the Rapid Oil Change facility at <br />Lexington and Roselawn. Doug Strong from Engineering has <br />reviewed the documents and found them to be acceptable. <br />�our cooperation is greatly appreciated. � <br />0 <br />� , n <br />