Laserfiche WebLink
0 <br />Er1G. <br />'S0: <br />FROM: <br />SUBJECT: <br />Ri.chard Turnlu�d� Village Admini�trator <br />Chaa. H. �o�tter, J�., Village Engineer <br />Strect Name Changes <br />,T,�nuary 23, 1962 <br />At�ached are six copies of the P�oposed. Stre�t Name Changes a.nd six copies of <br />the �ro'posed. Street Nanae Suffix Chan�es � Also attached are twelve copies of <br />a village ma�p showing theae changes. <br />The proposed changes are those proposed by the Planning Cormnission. The map <br />used is not up-to-date and no attempt was made to accompla.sh this. For i.nstance, <br />as Pineview Court is already correctly namec�. and is in accord.a.rbce with the <br />recoYmne�da�tions of �h� Planning Coimni.ssion, the street was not entered on the <br />list nor the map, and the old plattir�g rema3.ns. Nor does the map reflect the <br />xecent street vacations concerning Dionne�. <br />The list inclu�des the platted but unimproved streets. T�ducting the unimproved <br />streets from �the total list, there are 276 signs that wauld have to be changed.. <br />Using the latest pri�ces from the County and. assuming the standard.s and brackets <br />a.re ser�3.ceable, �.t wotil.d cost �2.48 per panel with two required for each change, <br />ar $73z.16. �b this�w�.11 be added the labor in replac3ng the panels plus any <br />other coxrective factor that may be required suc� as new panels and brackets <br />at 3.n�ersections tha� may have the old installation. <br />A field survey is being conducted to determine the nature of the existing signs <br />at the proposed changes. This survey will show the nature of the pres�nt panel, <br />- that is� i�' it is the older, embassed or painted panel, or the new reflectorized <br />.panel. <br />U�on completion of the survey we will be �.ble to make a closer estimate of cost <br />for the ehange-over. <br />CHStmes <br />Enc. <br />Respectf ully s ubmitted, <br />��`r`'����` <br />Chas. . Soutter, <br />Vi.l.lage Engine� <br />�� � <br />.E. <br />