Laserfiche WebLink
The Contractor shall agree, in addition to any other remedies <br />available to the City, that the City may withhold payment from the <br />Contractor in the amounts specified below as liquidated damages for <br />failure of the Contractor to fulfill its obligations. <br />The following acts or omissions shall be considered a breach of the <br />Agreement: <br />a) Missed Curbside Collection <br />$50 for each missed collection above two misses per <br />collection day, to be assessed at the end of each collection <br />month. A missed collection would be defined as a report by a <br />resident that their material was out by 7:00 a.m. and the <br />address did not appear on the Contractor's conveyance sheet <br />as a "Late Set Out" and the recyclables were properly sorted. <br />b) Missed Walk Up Collection <br />$50 per missed collection address above two misses at that <br />address in any four consecutive collection weeks. <br />C) Missed Multi Family Complex Collection <br />$50 per missed collection <br />d) Failure to Collect Material on a Block <br />$500 for each incident of the Contractor failing to pick up <br />material on a block. A missed block is defined as one side of <br />a street between cross streets or an entire cul de sac where <br />residents from at least three households on that street report <br />that they had their material out before 7:00 a.m., the material <br />was not picked up, the recyclables were properly sorted, and <br />the addresses did not appear on the Contractor's conveyance <br />sheets as "Late Set Outs." <br />e) Failure to Collect an Entire Zone <br />$1,000 for each incident of failure to complete collection of a <br />collection zone on its designated day as defined in Exhibit A <br />when the Contractor has not received an extension of <br />collection hours from the Recycling Coordinator or <br />designated alternate. <br />f) Failure to Complete a Majority (50%) of the Collection <br />35 <br />