My WebLink
|
Help
|
About
|
Sign Out
Home
2016-02-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-02-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 1:51:13 PM
Creation date
2/18/2016 1:33:47 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/23/2016
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o) Failure to collect recyclables according to specifications in <br />5.05 and 5.08 <br />$250 for each witnessed report of a driver inappropriately <br />collecting recyclable material <br />The Contractor shall be liable for liquidated damages amount(s) upon <br />determination of the City of Roseville that performance has not <br />occurred consistent with the provisions of the contract. The City shall <br />notify Contractor in writing or electronically of each act or omission <br />in this Agreement reported to or discovered by the City. It shall be <br />the duty of Contractor to take whatever steps or action may be <br />necessary to remedy the cause of the complaint. <br />The City may deduct the full amount of any damages from any <br />payment due to the Contractor. The remedy available to the City <br />under this paragraph shall be in addition to all other remedies which <br />the City may have under law or at equity. <br />Exceptions: For the purposes of this Proposal, the Contractor shall <br />not be deemed to be liable for penalties where its inability to perform <br />recycling collection service is the result of conditions beyond the <br />control of the Contractor, including but not limited to civil disorder, <br />acts of God, inclement weather severe enough that trucks cannot <br />safely take collections, provided however, that the Contractor shall <br />obtain the approval for the delay from the Recycling Coordinator or <br />their designee prior to 4:00 p.m. of the scheduled Collection Day. <br />8.06. Services Not Provided For <br />No claim for services furnished by the Contractor not specifically <br />provided for herein shall be honored by the City. <br />9. INSURANCE AND OTHER LEGAL REQUIREMENTS <br />9.01. Insurance <br />Insurance secured by the Contractor shall be issued by insurance <br />companies acceptable to the City and admitted in Minnesota The <br />insurance specified may be in a policy or policies of insurance, <br />primary or excess. Such insurance shall be in force on the date of <br />execution of the contract and shall remain continuously in force for <br />the duration of the contract. <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.