My WebLink
|
Help
|
About
|
Sign Out
Home
2016-02-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-02-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 1:51:13 PM
Creation date
2/18/2016 1:33:47 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/23/2016
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
216 <br />217 <br />218 <br />219 <br />220 <br />221 <br />222 <br />223 <br />224 <br />225 <br />226 <br />227 <br />228 <br />229 <br />230 <br />231 <br />232 <br />233 <br />234 <br />235 <br />236 <br />237 <br />238 <br />239 <br />240 <br />241 <br />242 <br />243 <br />244 <br />245 <br />246 <br />247 <br />248 <br />249 <br />250 <br />251 <br />252 <br />253 <br />Mr. Culver deferred to Environmental Engineer Ryan Johnson to provide more <br />detailed projected financials and options for retaining the power purchase <br />agreement and allowing Kenyon access to the roof space and city purchase of <br />power from them, with a minimum savings of $151,000 projected at the end of <br />that twenty-year period, and 11% savings in that twentieth year. At that time, <br />when the twenty years is up, Mr. Johnson noted the agreement calls for the tax <br />equity partner to remove the panels from the roof and the city can start over again. <br />Mr. Johnson noted that the improved technology by that time may provide less <br />expensive and more efficient systems at that time, or availability of other <br />programs, but probably not via tax credits, if a replacement solar system was <br />desired for the skating center roof at that time. <br />Mr. Johnson and Mr. Culver noted that staff was working out final details for roof <br />maintenance as part of the agreement, and had met with Parks & Recreation <br />Department staff to address their concerns with the city's obligation for <br />maintenance staff and current agreement between the city and roofing company <br />related to the roof warranty and their respective maintenance of the roof to <br />guarantee there would be no leaks. Mr. Culver noted that the current maintenance <br />agreement for the skating center roof, along with the City Hall and Public Works <br />maintenance building roofs, represented a gr� rrangement and meetings had <br />also been held with that firm to address any i is on that agreement and <br />warranty from their perspective with this solar in tallation. While there seems to <br />be little concern with Sundial Solar puncturing the roof, allowing the roofing <br />contractors access to the roof under the solar panels is still pending resolution. As <br />the agreement is currently written, Mr. Culver noted that the city would <br />potentially lose money if the panels needed to be moved for roof maintenance, <br />and they were obviously not operational for a period of time. <br />ed that attempt initially been made to size the system to allow <br />space to s ift the panels temporarily elsewhere on the roof to <br />roof porti However, Mr. Culver advised that a question <br />er shiftiingsible while retaining operations or shifting <br />ing them durinaintenance and reinstalling them were the best <br />RE <br />asked if this maintenance on a quadrant of the roof was for a two- <br />week period or only represented a loss of solar power for a 2-3 day period. <br />254 <br />Mr. Culver responded that, in 2014, the city performed major maintenance on the <br />255 <br />City Hall and Public Works roofs, with this roof similar to that construction of a <br />256 <br />liner covered with rock necessitating vacuuming the rock for reconditioning of the <br />257 <br />liner and replacement of the rock, with that process taking between 1-2 weeks per <br />258 <br />roof. However, Mr. Culver noted that may require a longer period of time if the <br />259 <br />solar panels needed to be shifted around or if only one quadrant was addressed at <br />260 <br />a time. <br />261 <br />Page 6 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.