Laserfiche WebLink
Agreement PW2016 <br />RAMSEY COUNTY <br />COOPERATIVE AGREEMENT <br />WITH THE CITY OF ROSEVILLEFOR <br />SIDEWALK CONSTRUCTION OFLARPENTEUR AVENUE <br />(COUNTY STATE AID HIGHWAY 30) <br />BETWEEN MACKUBIN STREETANDGAULTIER STREET <br />S.A.P. 160,020,028, S.A.P. 062-630-063 <br />ThisAgreement is between the City of Roseville, a municipal corporation ("City") and <br />Ramsey County, a political subdivision of the State of Minnesota, ("County") for the <br />sidewalk construction onLarpenteur Avenuebetween Mackubin Street and Gaultier <br />Street, (“Project”). <br />WITNESSETH: <br />WHEREAS, the City and the County desire to proceed with the Project; and <br />WHEREAS, the Project is identified in Ramsey County’s Transportation Improvement <br />Program; and <br />WHEREAS, Victoria Street,in the area affected by reconstruction, is designated County <br />State Aid Highway (CSAH) 30;and <br />WHEREAS, the Project been designated by the Minnesota Department of Transportation <br />(Mn/DOT) as eligible for County State Aid Highway funds; and <br />WHEREAS, the Project has beendesignated as State Aid Project (S.A.P.)062-630-063, <br />andState Aid Project (S.A.P.) 164-020-028;and <br />HEREAS, the subject road segment is locatedwithin the City; and <br />W <br />WHEREAS, the proposed Project,includes, in addition to other items, grading, paving, <br />concrete curb and gutter,bituminoussidewalk,pedestrian curb ramps, turf establishment, <br />retaining wall, fence, and related features;and <br />W <br />HEREAS, construction of storm sewer systems will be constructedas part of theProject <br />in accordance with local watershed rules; and <br />WHEREAS, plans for the Projectshowing proposed construction will be presented to the <br />Countyand will be onfile at City of Roseville Public Works Department; and <br />NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AS FOLLOWS: <br />PW2016 Page 1 of 6 <br /> <br />