Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br />Date: March 14, 2016 <br />Item No.: 11b <br />Department Approval City Manager Approval <br />Item Description: Minnesota Department of Transportation Construction Project Update <br />B <br />ACKGROUND <br />1 <br />Mark Lindeberg, Area Engineer from the Minnesota Department of Transportation, will be <br />2 <br />presenting an update on several Mn/DOT projects in and around the City of Roseville in 2016 and <br />3 <br />beyond. <br />4 <br />Projects include: <br />5 <br />TH 36 at Lexington Ave Bridge Replacement (2016) <br />6 <br />TH 280 Reconstruction (2016) <br />7 <br />I-35W Resurfacing Project (2016) <br />8 <br />Upcoming 35W Managed Lane Project (2018 or beyond) <br />9 <br />I-94 Bridge Repair Projects <br />10 <br />FI <br />INANCIAL MPACTS <br />11 <br />The only project that will be discussed that has a City financial contribution identified to date is the <br />12 <br />TH 36 at Lexington Ave Bridge project whereby the City is paying for a portion of the new sidewalk <br />13 <br />on the east side of Lexington Ave. There may be some City costs for the larger 35W Managed Lane <br />14 <br />project, but any costs have not been identified at this time. <br />15 <br />SR <br />TAFF ECOMMENDATION <br />16 <br />Staff requests that the City Council receive the presentation from the Minnesota Department of <br />17 <br />Transportation. <br />18 <br />RCA <br />EQUESTED OUNCIL CTION <br />19 <br />Receive presentation from the Minnesota Department of Transportation. <br />20 <br />Prepared by: Marc Culver,Public Works Director <br />21 <br />Attachments: A: TH 36 at Lexington Project Information <br />B: TH 280 Reconstruction Project Information <br />C: I-35W Managed Lane Project Information <br />D: I-35W Resurfacing Project Information <br />E: I-94 Bridge Repair Crossing Projects Information <br />Page 1 of 1 <br /> <br />