Laserfiche WebLink
Major Maintenance Activities: <br />• Continued tree trimming. <br />• Began street sweeping. <br />• Began spray patching potholes as weather allows. <br />• Continued sign replacement <br />• Performed inlet/outlet inspections of storm sewer <br />• Hauled watermain break material <br />• Some staff participated in "Shade Tree" class <br />• Continue working on meter repairs. Only 70 meters remain to be upgraded to new meter <br />and radio. <br />• Repaired water valve at County Rd B and Fry St. <br />• Repaired five water main breaks <br />• Worked with contractor and consultant at St. Croix Lift Station project to get training and <br />make system operational. <br />• Began 2016 flushing dead end sewer mains. <br />• Worked with facilities contractor to get bids on carpet and window cleaning <br />• Staff attended "Work Zone Traffic Safety" seminar <br />• Collected bacteriological samples <br />Attachments: <br />A: 2016 Project Map <br />B: MnDot Project Presentation <br />