Laserfiche WebLink
1-94 bridge repair: Pelham Avenue to <br />Western Avenue, St. Paul <br />N <br />A <br />r St. Paul <br />a <br />N a j j <br />V Q> a <br />2 m n <br />i � C <br />Q I� <br />E � <br />� u <br />State project 2016 <br />County project 2018 or 2019 <br />— State project 2018 <br />► Repair, resurface or replace <br />bridge decks <br />► Construction Cost: $4.2M <br />12 <br />