Laserfiche WebLink
Had <br />L b'� Canty Raad 96 <br />$]II (CkWand Aveao) <br />Cony Road B2 County idadC County R.wD <br />(Tondal Roes) (CII Camra D*.) <br />pNd <br />NOTES; <br />-ADD ONE LANE IN EACH DIRECTION IN THE MIDDLE, <br />WHICH WILL BE A MNPASS LANE, FROM OR C TO LEXINGTON AVE, <br />- ORANGE INDICATES BRIDGES THAT WILL BE REPLACED POUR AT <br />OR C AND ONE AT OR 1) ALL OTHER BRIDGES WILL BE LE`7 ASIS <br />- ALL LANES PAVED WITH CONCRETE FROM CR C TO SUNSET AVE <br />-APPROYJMATE COST $20& MILLION -ESTIMATE CONSTRUCTION <br />START IN SPRING 2019. <br />- ADD LANES ON OUTSIDE AS SHOWN IN BLUE. <br />y Rued S] (Lan p, Awnua) <br />County Road 59(Surcel Menne) <br />a <br />Arm <br />Old Illakway A <br />Bfld➢a <br />�, <br />S�Avenun , <br />I, <br />II <br />w <br />3 <br />;,ante Road! 10 ;- <br />„annryNmnr6 <br />7�1 <br />Q MyRindE2 CountylIJR�d <br />y Road 96 <br />County Road H <br />(G Saeed (Lake V@W'J ie <br />pNd <br />NOTES; <br />-ADD ONE LANE IN EACH DIRECTION IN THE MIDDLE, <br />WHICH WILL BE A MNPASS LANE, FROM OR C TO LEXINGTON AVE, <br />- ORANGE INDICATES BRIDGES THAT WILL BE REPLACED POUR AT <br />OR C AND ONE AT OR 1) ALL OTHER BRIDGES WILL BE LE`7 ASIS <br />- ALL LANES PAVED WITH CONCRETE FROM CR C TO SUNSET AVE <br />-APPROYJMATE COST $20& MILLION -ESTIMATE CONSTRUCTION <br />START IN SPRING 2019. <br />- ADD LANES ON OUTSIDE AS SHOWN IN BLUE. <br />y Rued S] (Lan p, Awnua) <br />County Road 59(Surcel Menne) <br />a <br />