My WebLink
|
Help
|
About
|
Sign Out
Home
2015-07-01_VB_Agenda_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Variance Board
>
Agendas and Packets
>
2015 Agendas
>
2015-07-01_VB_Agenda_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 4:46:22 PM
Creation date
4/8/2016 4:46:19 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Variance Board
Commission/Committee - Document Type
Agenda/Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment C <br />NorthAmericanBankingCompany,Roseville <br />RequestforVarianceApprovalNarrative <br />NorthAmericanBankingCompany(aStateCharterMemberBankwithitsCharterinRoseville),is <br />seekingapprovalfromtheCityofRosevilleVarianceBoardforanexceptiontothecurrentcitycode.The <br />projectislocatedat2230AlbertStreet,wherethebankhasoperatedfor17yearsinwhatwasthe <br />original1965RosevillePostOffice.TheBankwouldliketoremodeltheentirefacilitiesinsideandout. <br />Whenthebankfirststartedseveralchangesweremadetothepostofficebuildingbutonlyminor <br />changesasitwasastartupbusiness.Nowthatthebankhasgrowntobealmost$400millioninassets <br />withthreeadditionallocationitfeelsitistimetoreinvestintheoriginallocation. <br />Request: <br />NorthAmericanBankingCompanywouldliketodeviatefromtheprescribedexteriormaterial <br />allocationsinordertoenhancetheoverallappearanceofthebuildingwhilemaintainingthewonderful <br />originalbrickworkbuteliminatingtheutilitarianconcretesurfacesonthenorthsideofthebuilding. <br />Theconcretefaçadewallposessomechallengestoreplacementduetothewayitisattachedtothe <br />building.Removalwouldallbutbeimpossible.Thesurfaceofthestructure(ribbed)ontheNorthSide <br />ķƚĻƭƓƷallowfornewbricktobeeasilyattachedtothesurface.Itisalsoimpossibletofindabrickcolor <br />tomatchtheexistingbrick.Thematerialchosenwillbeofthehighestqualitymetalandarethoughtfully <br />arrangedtocreatevisualinterest,varyingperelevationbutalwaysgroundedwiththeoriginalbrick. <br />Theentirepropertywillcontinuetobelandscapedtothehighestquality.Theadditionalnewmaterials <br />proposedwillcreateahighqualitybuildingwithrichvisualinterestthatthecommunitywillembrace. <br />Thecalculationbelowreflectsthesquarefootagesbyelevation;itiseasytoseewhytheprojecthasa <br />percentagebasisthatissohighduetothelargesurfaceareaoftheconcretefaçadealongtheNorth <br />Side <br />ElevationTotalSqFtMetalPanelSqFtPercentage <br />East166538623.18% <br />North2320141260.86% <br />West154937524.21% <br />South246035214.31% <br />SubTotal7994252531.59% <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.