Laserfiche WebLink
Page 7 of 38 <br /> Permit No: MNR040000 <br /> applicant shall describe tasks and corresponding schedules necessary to satisfy the permit <br /> requirements in accordance with the schedule in Appendix A,Table 2 (existing permittee <br /> applicants), or Table 3 (new permittee applicants). <br /> 3. A description of existing Enforcement Response Procedures (ERPs)the applicant has <br /> developed and implemented that satisfy the requirements of Part III.B.1. If the applicant has <br /> not yet developed ERPs (e.g., new permittee applicants), or existing ERPs must be updated <br /> to satisfy new requirements, the description must include tasks and corresponding <br /> schedules necessary to satisfy the permit requirements in accordance with the schedule in <br /> Appendix A,Table 2 (existing permittee applicants), or Table 3 (new permittee applicants). <br /> 4. A description of the status of the applicant's storm sewer system map and inventory as <br /> required by Part III.C.The description must indicate whether each requirement of Part <br /> III.C.1, is satisfied, and for Part III.C.2, is complete, at the time of application. For each <br /> requirement of Part III.0 that is not satisfied at the time of application, the applicant shall <br /> include tasks and corresponding schedules necessary to satisfy the mapping and inventory <br /> requirements in accordance with the schedule in Appendix A,Table 2 (existing permittee <br /> applicants), or Table 3 (new permittee applicants). <br /> 5. For each Minimum Control Measure (MCM) outlined in Part III.D: <br /> a. The Best Management Practices (BMPs)the applicant will implement, or has <br /> implemented, for each MCM. <br /> b. The measurable goals for each of the BMPs identified in Part II.D.5.a, including as <br /> appropriate, the months and years in which the applicant will undertake required <br /> actions, including interim milestones and the frequency of the action, in narrative or <br /> numeric form, as appropriate. <br /> c. Name(s) of individual(s) or position titles responsible for implementing and/or <br /> coordinating each component of the MCM. <br /> 6. For each applicable Waste Load Allocation (WLA)approved prior to the effective date of <br /> this permit, the applicant shall submit the following information as part of the SWPPP <br /> document: <br /> a. TMDL project name(s) <br /> b. Numeric WLA(s), including units <br /> c. Type of WLA(i.e., categorical or individual) <br /> d. Pollutant(s)of concern <br /> e. Applicable flow data specific to each applicable WLA <br /> f. For each applicable WLA not met at the time of application, a compliance schedule is <br /> required. Compliance schedules can be developed to include multiple WI-As associated <br /> with a TMDL project and shall include: <br /> (1) Interim milestones, expressed as BMPs or progress toward implementation of BMPs <br /> to be achieved during the term of this permit <br /> (2) Dates for implementation of interim milestones <br /> (3) Strategies for continued BMP implementation beyond the term of this permit <br /> (4) Target dates the applicable WLA(s)will be achieved <br />