My WebLink
|
Help
|
About
|
Sign Out
Home
2016-04-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-04-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 9:17:57 AM
Creation date
4/22/2016 9:02:41 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/26/2016
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c) Routine Maintenance of structural stormwater BMP's already required by this permit cannot be used to <br /> meet mitigation requirements. <br /> d) Mitigation projects shall be completed within 24 months after the start of the original construction <br /> activity. <br /> e) The permittee shall determine, and document, who will be responsible for long-term maintenance on all <br /> mitigation projects of this part. <br /> f) If the permittee receives payment from the owner and/or operator of a construction activity for <br /> mitigation purposes in lieu of the owner or operator of that construction activity meeting the conditions <br /> for post-construction stormwater management, the permittee shall apply any such payment received to a <br /> public stormwater project, and all projects must be in compliance with Part III.D.5.a(4)(a)-(e). <br /> Page 2 of 2 DRAFT <br />
The URL can be used to link to this page
Your browser does not support the video tag.