My WebLink
|
Help
|
About
|
Sign Out
Home
2016-05-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-05-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2016 4:24:58 PM
Creation date
5/19/2016 4:24:11 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/24/2016
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 32 of 38 <br /> Permit No: MNR040000 <br /> Develop, implement, and enforce Regulatory Mechanism. e Within 12 months of the date permit coverage is <br /> extended. <br /> Construction Site Stormwater Runoff Control <br /> (see Part III.D.4) <br /> Develop, implement, and enforce Regulatory Mechanism. e Within six(6) months of the date permit coverage is <br /> extended. <br /> Post-Construction Stormwater Management <br /> (see Part III.D.5) <br /> Develop, implement, and enforce Regulatory Mechanism. e Within 24 months of the date permit coverage is <br /> extended. <br /> Part 111.13 Enforcement Response Procedures(ERPs) <br /> Develop and implement written ERPsfor the Regulatory e Within 24 months of the date permit coverage is <br /> Mechanism(s)required under Part III.A. extended. <br /> Part III.0 Mapping and Inventory <br /> Part III.C.1 Mapping <br /> Develop a storm sewer system map. e Within 24 months of the date permit coverage is <br /> extended. <br /> Part III.C.2 InventorV <br /> Complete and submit inventory in accordance with Part e Within 24 months of the date permit coverage is <br /> 111.C.2. extended. <br /> Part IILD Minimum Control Measures <br /> Part III.D.4 Construction Site Stormwater Runoff Control <br /> Develop, implement, and enforce a Construction Site e Within six(6) months of the date permit coverage is <br /> Stormwater Runoff Control program. extended.See Part III.A Regulatory Mechanism(s). <br /> Part III.D.5 Post-Construction Stormwater Management <br /> Develop, implement, and enforce a Post-Construction e Within 24 months of the date permit coverage is <br /> Stormwater Management program. extended.See Part III.A Regulatory Mechanism(s). <br /> Part III.D.6 Pollution Prevention/Good Housekeeping for <br /> Municipal Operations <br /> Part III.D.6.e Inspections <br /> Conduct inspections. e Annually(Part III.D.6.e(l)and (2)),Quarterly(Part <br /> III.D.6.e(3)). <br /> Part IILE Impaired Waters and TMlDLs(if applicable) <br /> e Submit a//information required by Part III.E. e With each Annual Report required in Part IV.B. <br /> Part III.F.Alum or Ferric Chloride Phosphorus Treatment <br /> Systems(if applicable) <br /> Meet requirementsfor treatment systems under Part e Within 12 months of the date permit coverage is <br /> 11I.F. extended. <br /> PARTIV. ANNUAL SWPPP ASSESSMENT,ANNUAL <br /> REPORTING AND RECORD KEEPING <br /> Part IV.A Annual SWPPP Assessment <br /> Conduct assessment of the SWPPP. e Annually and prior to completion of each Annual <br /> Report. <br /> Part IV.B Annual Reporting <br /> e Submit an Annual Report. e By June 301h of each calendar year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.