My WebLink
|
Help
|
About
|
Sign Out
Home
2016-05-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-05-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2016 4:24:58 PM
Creation date
5/19/2016 4:24:11 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/24/2016
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.In the event that a sewer service exists from the main sewer to a point outside of the <br /> street,the contractor shall excavate and expose the upper end of the service pipe.The <br /> elevation of the pipe leaving the structure shall be determined,and the difference between <br /> the two pipes shall be sufficient so that a minimum grade of one-eighth inch per foot is <br /> maintained.(1990 Code) <br /> D. Alignment:No connecting sewer shall contain bends or a combination of bends which at <br /> any point shall be greater than 45 degrees,and no more than two bends,regardless of angle, <br /> shall be permitted in any single house connection except where manholes or,in case of slab <br /> home,cleanouts are constructed at such points and in manner as directed by the Public <br /> Works Director.No connecting sewer shall be laid parallel to any bearing wall or footing <br /> unless further distant than three feet from any such bearing wall or footing.No connecting <br /> sewer shall be laid within 20 feet of any existing well.(Ord.234,8-6-57) <br /> E. Trenching and Backfilling: <br /> 1.All excavations shall be open trench work unless otherwise authorized by the City <br /> Engineer.The foundation in the trench shall be formed to prevent any subsequent settlement <br /> of the pipes.If the foundation is good and firm earth,the earth shall be pared or molded to <br /> give a full support to the lower third of each pipe.Bell holes shall be dug to provide ample <br /> space for pouring of joints.Care must be exercised in backfilling below the center line of the <br /> pipe in order to give it proper support. <br /> 2.Backfilling shall be placed in layers and solidly tamped or packed up to two feet above <br /> the pipe.Backfilling shall not be done until the section to be backfilled has been <br /> inspected and approved by the Public Works Director. <br /> F. Use of Existing Sewer Services:Existing sewer services or portions of such sewers may be <br /> approved for use by the Public Works Director.The Public Works Director may request that <br /> the old sewer be excavated for the purpose of facilitating inspection.No cesspool or septic <br /> tank shall be connected to any portion of a house sewer that is also laid across or over any <br /> existing cesspool or septic tank�the existing cesspool or septic tank shall first be pumped <br /> clean and filled with earth to the surrounding ground level.Where a sewer is laid across or <br /> over any existing cesspool or septic tank,only material approved by the Public Works <br /> Director shall be used for that portion of the connecting sewer which is laid across or over <br /> the existing cesspool or septic tank. <br /> G. Connections at"Y"Only:Every connecting sewer shall be connected to the Municipal <br /> sewer system at the"Y"designated for the property served by the connection,except where <br /> otherwise expressly authorized by the Public Works Director.Where expressly authorized <br /> by the Public Works Director,all connections made at points other than the designated"Y" <br /> shall be made only under the direct supervision of the Public Works Director in such <br /> manner as the Public Works Director may direct. <br /> H. Sump pumps: <br /> 1. All new 4nd existing structures with sumps for which a building permit is issued shall be �mmentiw�ELS21.�AddedLangu�age �::::::] <br /> plumbed to the outside of the dwelling and inspected by City personnel before a certificate <br /> of occupancy is issued.A sump pump discharge system shall not be connected directly or <br /> indirectly to the City's sanitary sewer system.A sump pump shall have a permanently <br /> installed discharge line,which provides for year-round discharge to the outside of a <br /> building or structure.�he discharge line shall be terminated on private property and not in <br /> public right of way unless approved by the Public Works Director.The discharge line shall <br /> not discharge water in locations that would cause negative impacts to adjacent property <br /> owners or the public.It shall consist of a rigid discharge line inside the dwelling or <br /> building,with glued fittings that do not contain unions for other than pump service,bypass <br /> valves or apparatus inside the dwelling or building that allow for altering the path of <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.