My WebLink
|
Help
|
About
|
Sign Out
Home
2016_0418_CCPacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2016
>
2016_0418_CCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2016 2:30:40 PM
Creation date
6/8/2016 2:30:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br />Page 27 of 38 <br />Park Improvement Plan: <br /> <br />Fencing maintenance annually per industry standards. Consists of <br />repairing direct damage issues, curling of bottom areas and other <br />larger maintenance items <br /> <br />Inspection by staff bi-annually spring and fall. Adjust interval <br />o <br />according to inspection program. <br /> <br />Foul ball and safety netting replacements on 10 year interval per <br />industry standards. <br /> <br />Inspection by staff bi-annually spring and fall. Adjust interval <br />o <br />according to inspection program. <br /> <br />Outfield/sod maintenance annually per industry standards. Consists of <br />regrading minor uneven areas and sod replacement. <br /> <br />Inspection by staff bi-annually spring and fall. Adjust interval <br />o <br />according to inspection program. <br /> <br />Infield maintenance annually per industry standards. Consists of <br />regarding uneven areas and adjusting aglime depth. <br /> <br />Inspection by staff bi-annually spring and fall. Adjust interval <br />o <br />according to inspection program. <br /> <br />Irrigation maintenance annually per industry standards. <br /> <br />Inspection by staff bi-annually spring and fall. Adjust interval <br />o <br />according to inspection program. <br /> <br />Lighting maintenance annually per industry standards. Consists of <br />bulb and ballast replacements. <br /> <br />Inspection by staff bi-annually spring and fall. Adjust interval <br />o <br />according to inspection program. <br />Capital Improvement Plan: <br /> <br />Full field update on 5 year intervals per industry standards. Full <br />regrade and resurface field as needed. Major uneven areas including <br />new sod and aglime as needed. <br /> <br />Inspection by staff bi-annually spring and fall. Adjust interval <br />o <br />according to inspection program. <br /> <br />Fencing upgrade on 10 year intervals per industry standard. Includes <br />fabric and post replacement as needed. <br /> <br />Inspection by staff bi-annually spring and fall. Adjust interval <br />o <br />according to inspection program. <br /> <br />Full rebuild on 30 year intervals. Includes full replacement of all of <br />the above items and dugouts, irrigation, and all site amenities. <br /> <br />Inspection by staff bi-annually spring and fall. Adjust interval <br />o <br />according to inspection program. <br />5.6Garden and other irrigation systems: <br /> <br />Condition Rank Description of Condition <br />Б <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.