My WebLink
|
Help
|
About
|
Sign Out
Home
2016_0418_CCPacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2016
>
2016_0418_CCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2016 2:30:40 PM
Creation date
6/8/2016 2:30:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br />Page 11 of 38 <br />0´¬¯ 3³ ³¨® <br />Pump station rating is based on a needs studies that are completed on the station. <br />Condition rating is a scale from 1-10 and is based upon the needs studies. <br />Assets – 1 pump station <br />Goal: To complete rehab recommended by needs studies. <br />Replacement: Rehab recommended by needs studies. <br />7 ³¤± -¤³¤±² <br />Condition Definition <br />Rating <br />3New <br />2 Good Condition or Retrofitted Badger meters <br />1 Poor: In bad condition or non/radio enabled meters. <br />Assets – 11,400 water meters <br />Goal: To have every meter in the City be radio enabled. <br />Replacement: replace older meters with new radio enabled meters. <br />3 ¨³ ±¸ 3¤¶¤± <br />3 ¨³ ±¸ 0¨¯¤ <br />Definition: Any pipe that conveys sanitary sewer. <br />Condition Rating System: Sanitary sewer pipe is rated on a combination of pipe age, pipe material, inspection <br />records and maintenance records. <br />Condition RatingDefinition <br />5 New,:<5 years old, modern pipe material, no maintenance issue <br />4 Good: <50 years old, modern pipe material, no maintenance issues. Max rating for <br />CIPP. <br />3 Fair: Minor issues, manageable maintenance. Maximum rating for VCP and RCP. <br />2 Poor: Needs rehab or replacement, high maintenance, major issues such as I&Ior <br />sewer backup history <br />1 Very poor: Needs replacement, very high maintenance, immediate risk of failure <br />0 Failed: Out of service or no longer functions <br />Assets – 145.18 miles <br />Goal: To have a minimum rating of 3.0. <br />Replacement: Typically pipe will be replaced when the rating is below 3. <br />10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.