Laserfiche WebLink
Section 801.12 of this Chapter. In addition, before any permit shall be issued, the following <br />conditions shall be complied with: <br />A. Certification by Public Works Director: No permit shall be issued to tap or connect with any <br />water main of the City directly or indirectly from any lot or tract of land unless the Public <br />Works Director shall have certified: <br />1. That such lot or tract of land has been assessed for the cost of construction of the water <br />main with which the connection is made; or <br />2. If no assessment has been levied for such construction cost, the proceedings for levying <br />such assessment have been or wili be completed in due course; or <br />3. If no assessment has been levied and no assessment proceedings will be completed in due <br />course, that a sum equal to the portion of cost of constructing said water main would be <br />assessable against said lot or tract has been paid to the City. (Ord. 388, 4-22-63; amd. 1995 <br />Code) <br />B. Additional Connection Fee: <br />1. If no such certificate can be issued by the Public Works Director, no permit to tap or <br />connect to any water main shall be issued unless the applicant shall pay an additional <br />connection fee which shall be equal to the portion of the cost of coristruction of the said main <br />which would be assessable against said lot or tract to be served by such tapping connection, <br />including interest at a rate equal to the interest rate of the original assessment and continuing <br />for a period of 20 years or the ainount of years the assessment was payable, whichever is less. <br />Interest may be waived or decreased when it is determined by the Public Works Director that <br />the improvement was not subject to utilization until a later date. <br />2. The assessable cost is to be determined by the Public Works Director upon the same basis as <br />any assessment previously levied against other property for the said main. If no such <br />assessment has been levied, the assessable cost will be determined upon the basis of the <br />uniform charge which may have been or which shall be charged for similar tapping or <br />connection with such main, determined on the basis of the total assessable cost of the main, <br />allocated on a frontage basis, acreage basis, or both. (Ord. 745, 12-30-74; amd. 1995 Code) <br />801.14 : TURNING ON WATER: <br />No person except an authorized City employee shall turn on or off any water supply at the stop box <br />without permission from the Public Works Director. Authorized City employees shall be allowed <br />access to stop boxes at all times. (Ord. 388, 4-22-63; amd. 1995 Code) <br />801.15 : WATER METERS: <br />A. Meters Required: Except for extinguishment of fires, no person, except authorized City <br />employees, shall use water from the water system or permit water to be drawn from the <br />water system unless the saine be metered by passing through a meter supplied or approved <br />by the City. No person not authorized by the Public Works Director shall connect, <br />disconnect, take apart or in any manner change, cause to be changed or interfere with any <br />such meter or the action of such meter. (Ord. 388, 4-22-63) <br />1. Master Meter: Commercial or industrial buildings shall be metered with one master meter of <br />adequate size as approved by the Director of Public Works. <br />2. Auxiliary Meters: If additional or auxiliary meters are desired for recording the subdivision <br />of such supply, they must be furnished and set up by the owner or consumer at the owner or <br />consumer's expense and the owner or consumer must assume all responsibility of reading, <br />