My WebLink
|
Help
|
About
|
Sign Out
Home
2016-08-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-08-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 4:05:21 PM
Creation date
8/18/2016 3:56:42 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/23/2016
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: August 23, 2016 Item No: 6 <br />Item Description: 35W Managed Lane Project <br />Background: <br />The Minnesota Department of Transportation (MnDOT) is proposing a project along Interstate <br />35W that will add a Managed Lane in each direction from Trunk Highway 36 in Roseville to <br />Anoka County State Aid Highway 17 (Lexington Ave) in Blaine. This project is tentatively <br />scheduled for 2019, although MnDOT is working to accelerate this project for possible <br />construction starting in 2018. <br />A Managed Lane is a lane of traffic that will be limited to high occupancy vehicles (HOV) or <br />transit vehicles as well as single occupancy vehicles that pay a fee to use that lane during certain <br />times of the day based on congestion levels. The fee paid will vary based on the level of <br />congestion. Managed Lanes are currently in operation on 1-394,1-35W south of downtown <br />Minneapolis and I -35E north of St. Paul. <br />The project will involve repaving the entire roadway section of I -35W including any ramps that <br />have not been repaved as part of a recent project. The widening of the roadway will also require <br />the construction of new bridges that currently extend over County Road C and Rosegate in the <br />City of Roseville. A layout of the overall proposed project is available for viewing at the Public <br />Works Department at the Roseville City Hall. An electronic version is also available for on-line <br />viewing at MnDOT's Project Website located at: <br />httn://www.dot.state.mn.us/metro/nroiects/i35wroseville/index.html <br />Included as attachments are clips of the overall layout showing: <br />• The project area within the limits of the City of Roseville <br />• Typical section of the widened I -35W Corridor <br />• The area between County Road E2 and the 694 Interchange showing added <br />auxiliary lanes to improve the overall operation of the interchange area <br />Staff will make a brief presentation about the project and answer any questions the Commission <br />may have. <br />Recommended Action: <br />Receive presentation. <br />Attachments: <br />A. 35W Managed Lane Project—Portions of Layout <br />
The URL can be used to link to this page
Your browser does not support the video tag.