Laserfiche WebLink
Capital Improvement Plan <br />City of Edina, MN <br />2017 2021thru <br /> Description <br />This project would include the rehabilitation of Well # 6 by repairing or replacing the well <br />pump, motor, and other worn equipment. <br />ENVIRONMENTAL CONSIDERATION <br />Motor and pump assembly are premium efficient rated and controlled by Variable Frequency <br />Drives (VFD) that optimize energy use and pump efficiency. <br />Project #15-101 <br />Priority 1 Critical <br /> Justification <br />As outlined in Vision Edina, it is the mission of the City Council to provide effective and <br />valued City services. Specifically, the Comprehensive Plan identifies a goal to Provide the <br />City’s water customers with safe, reliable, high quality potable water supply. In order to <br />provide a reliable, sound infrastructure, the Public Works Department has implemented a 7 <br />year rehabilitation schedule for each of its municipal water wells. This fits into that work plan <br />as it was last rehabilitated in 2007. This is a well that runs year round. <br />Useful Life <br />Project Nam Well #6 Rehab <br />Category Infrastructure <br />Type Replace or repair <br />Contact Brian Olson <br />Department Public Works <br />Status Active <br />TotalExpenditures20172018201920202021FuturePrior <br />120,000120,000Construction <br />120,000 120,000Total <br />TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior <br />120,000120,000Utility Fund: Water <br />120,000 120,000Total <br />Tuesday, September 06, 2016Page 72 <br />DR <br />A <br />F <br />T <br />Item 5: Attachment A