Laserfiche WebLink
General Business Licenses and Permit Fees (continued) <br />Fee Description <br />Public improvement contract application fee <br />Recycling contractor <br />Rental licensing: <br />Multi family (per unit) <br />Multi family: reinstatement <br />Reinspection fee (per unit) <br />Failure to renew within 30 days of exp. <br />Failure to submit within 60 days of exp. <br />Fee appeal to City Council <br />Rental registration: <br />Housing <br />Mid-year (Jan 1-Jun 30) <br />Late renewal fee <br />Administrative fine (per unit) <br />Right of way permits: <br />Hole (per hole) <br />Trench <br />Boring <br />Non-excavation (obstruction) <br />Roll-off container <br />E�ension <br />P enalty <br />Curb cut <br />Sewer connection fees <br />Sewer usage fees <br />Soil contamination fee (per cubic yard) <br />Solid waste hauler license <br />Stormwater drainage fees <br />Stormwater impact fee (per cubic foot) <br />Stormwater residential permit: <br />Initial <br />Renewal (5 year term) <br />Street patcbing fee: <br />without curb <br />with curb <br />Sump pump waiver fee <br />Sump pump surcharge fee (per month) <br />Technology Fee (building) <br />Theaters (per viewing screen) <br />Tree planting and removal <br />Utility service location fee <br />Attachment C <br />City 2016 2017 <br />Code Amount Amount Comments <br />n/a 550.00 550.00 See comment 'C' below <br />403 125.00 125.00 <br />908 $ 20.00 $ 20.00 +$102.00 per building <br />908 102.00 102.00 <br />908 66.00 66.00 After 1 st inspection <br />908 500.00 500.00 Fee doubles every two weeks <br />908 - 500.00 Fee doubles every two weeks <br />908 50.00 50.00 <br />907 <br />907 <br />907 <br />907 <br />707 <br />707 <br />707 <br />707 <br />707 <br />707 <br />707 <br />707 <br />802 <br />802 <br />406 <br />402 <br />803 <br />1017 <br />n/a <br />n/a <br />n/a <br />n/a <br />802 <br />802 <br />n/a <br />310 <br />706 <br />n/a <br />35.00 35.00 Includes technology fee <br />17.50 17.50 Includes technology fee <br />- 35.00 <br />100.00 100.00 <br />400.00 400.00 <br />400.00 400.00 +$0.40 / lineal foot of trench <br />400.00 400.00 +$0.40 / lineal foot of boring <br />50.00 50.00 + $0.06 / lineal foot <br />50.00 50.00 <br />25.00 25.00 +$25.00 per week of extension <br />2 times amount of standard permit <br />50.00 50.00 <br />n/a n/a See separate section below <br />n/a n/a Established separately <br />1.00 1.00 max $300 <br />125.00 125.00 <br />n/a n/a Established separately <br />- 22.50 <br />250.00 250.00 <br />100.00 100.00 <br />650.00 700.00 <br />1,300.00 1,300.00 <br />- 50.00 <br />- 50.00 <br />- 2% of permit or license fee <br />70.00 70.00 <br />n/a n/a Established separately <br />100.00 100.00 <br />