Laserfiche WebLink
state. Construction would occur in 2018. <br />This existing pond located near Oakcrest Ave, east of Fairview is an existing <br />storm pond with a concrete ditch captures water from Rosedale Commons, and <br />provides rate control during large rain events. Staff will be studying and <br />designing plans to retrofit this pond to have an Iron Enhanced Sand Filter bench <br />installed around the perimeter. This filter bench will provide similar rate control, <br />but it will increase the removal of pollutants that degrade our local water <br />resources. The addition of this project will help the City meet a Total Maximum <br />Daily Load (TMDL) for Long Lake. Construction would not occur in 2017 but at <br />a later date. <br />4. Other Improvements <br />Rail Road Crossing Upgrades: Staff will be working with Minnesota Commercial Railway <br />to replace 5 railroad crossings in three locations on Terminal Rd and Walnut St. The existing <br />railroad crossing of the roadway and pathway are in poor condition. In particular, the <br />pathway crossings are in very poor condition creating a safety hazard. The project will <br />consist of replacing the tracks in the roadway and pathway with a new concrete surface and <br />new rails. Municipal State Aid funds will pay for the City portion of the costs. <br />Twin Lakes East Collector: As an extension of the Twin Lakes Parkway improvements, the <br />intersections of Terrace Ave and Lincoln Ave, and Lincoln Ave and C-2 will be evaluated to <br />provide a better connection from Fairview Ave to Snelling Avenue. An additional left turn <br />lane from east bound County Rd C-2 to Snelling will be provided as part of the project. <br />Funding for the project is through TIF funding. <br />Rosedale Signal Improvements: Staff will be working with a consultant to reconstruct the <br />signal light on County Road B-2 and the southbound Snelling ramps. This upgrade to the <br />intersection and the signal light was required as part of the Rosedale Mall expansion. The <br />majority of the cost of this project will be funded by the Rosedale Mall. <br />5. Other Proiects <br />Dale Street Parking Lot: Staff will be working on completely reconstructing the Dale <br />Street parking lot. The lot is planned to have storm water features added and the lot <br />configuration redesigned. <br />Comprehensive Surface Water Management Plan: Staff will continue to work with its <br />consultant on the Comprehensive Surface Water Management Plan (CSWMP) which is <br />required to be updated as part of the Comprehensive Plan. Staff plans to submit the final <br />version to the watersheds for final approval by August of 2017. <br />Comprehensive Plan including Water Supply Plan, Sanitary Plan, and Transportation <br />Plan: Staff will continue to complete the Water Supply Plan and Sanitary Sewer Plan <br />updates to the Comprehensive Plan. Additionally, staff will be hiring a consultant to assist <br />with updating the Transportation Plan. One major aspect that we will look at addressing in <br />this plan is updating the pathway master plan. <br />MS4 Permit Updates: Staff will be working with the Minnesota Pollution Control Agency <br />(MPCA) to address any changes that are need for our permit as the new permit renewal <br />process begins. <br />