Laserfiche WebLink
• Collected disinfection byproduct for testing. <br />• Repaired 2 broken watermain breaks since January. <br />• Worked with our SCADA integrator to adjust the radio paths from our lift stations to the <br />Public Works facility. <br />• Repaired a leaking hydrant valve at 1791 Dale Street. <br />• Began exercising large water distribution system valves. <br />Attachments: <br />A: 2017 Project Map <br />B: Development Activity Report <br />