My WebLink
|
Help
|
About
|
Sign Out
Home
2016-12-06_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2016
>
2016-12-06_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 2:47:23 PM
Creation date
3/31/2017 2:49:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Cost Estimate <br />o Prepare cost estimates for the clubhouse replacement. <br />o Prepare cost estimate for construction documents. <br />o Prepare cost estimates for construction administration. <br />o Prepare cost estimate for adjacent site infrastructure. <br />o Present preferred process and deliverables at "not to exceed costs". <br />5. Meetings <br />o Attend, facilitate and provide presentations as agreed: <br />■ Community Listening Sessions — up to five 3 hour meetings. <br />• Community at-large, Advisory Team, Parks and Recreation Commission, others. <br />• May be held in conjunction with monthly Parks and Recreation Commission meeting. <br />■ Design Presentations — two meetings. <br />• Parks and Recreation Commission — one meeting/presentation up to 2 hours. <br />• City Council — one meeting/presentation up to 1 hour. <br />6. Final Deliverable(s) <br />o Final Report to include: <br />■ Slte layout and phased approach (if needed). <br />■ Concept/schematic design for clubhouse building replacement that is ready to move to <br />construction documents. <br />■ Consideration for concept/schematic design and layout for adjacent site. <br />■ Budget estimates for: <br />• Clubhouse and adjacent site as defined. <br />• Construction documents and construction administration. <br />o Present information to the Parks and Recreation Commission and City Council. <br />TIMELINE <br />The City looks to secure: <br />• Schematic/concept designs for a rebuilt Clubhouse. <br />• Budget estimates to construct a replacement Clubhouse. <br />• Budget estimates for construction documents. <br />• Budget estimates for construction administration. <br />• Budget estimates for schematic/concept designs to renew adjacent infrastructure. <br />Time frame for this work will be created in agreement with the Design Team and Parks and Recreation Staff for <br />construction beginning late summer/early fall 2017. <br />Specific community/staff ineetings and presentation dates will be coordinated and scheduled with the selected <br />consultant/design firm. <br />2�Page <br />City of Roseville Clubhouse Renewal Proposat <br />Cedarholm Golf Course Clubhouse Replacement Design and Cost Estimates <br />
The URL can be used to link to this page
Your browser does not support the video tag.