Laserfiche WebLink
3Moderate condition –significant <br />maintenance required to return to accepted <br />level of service (10-20%) <br />4Poor condition –requires renewal, <br />significant renewal/upgrade required (20- <br />50%) <br />5Very poor condition –asset unserviceable, <br />over 50% of asset requires replacement <br />Industry useful life 30years <br />Park Improvement Plan: <br />Nets on a 5 year interval per industry standards. <br />Inspection by staff bi-annually spring and fall. Adjust interval <br />o <br />according to inspection program. <br />Sand/gravel ona 5 year interval per industry standards. <br />Inspection by staff bi-annually spring and fall. Adjust interval <br />o <br />according to inspection program. <br />Capital Improvement Plan: <br />Full rebuild on 30 year intervals per industry standards. New facilities <br />will include concrete edge and walls for all and site amenities. <br />Inspection by park staff bi-annually spring and fall. Adjust <br />o <br />interval according to inspection program. <br />5.5Athletic Fields <br />Condition Rank Description of Condition <br />1Very good condition–brand new–only <br />normal maintenance required <br />2Good condition –minor defects only, minor <br />maintenance required (5%) <br />3Moderate condition –significant <br />maintenance required to return to accepted <br />level of service (10-20%) <br />4Poor condition –requires renewal, <br />significant renewal/upgrade required (20- <br />50%) <br />5Very poor condition –asset unserviceable, <br />over 50% of asset requires replacement <br />Industry useful life 30years <br />7 <br /> <br />