My WebLink
|
Help
|
About
|
Sign Out
Home
2017-4-4_PR Comm Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Minutes
>
2017
>
2017-4-4_PR Comm Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 11:07:08 AM
Creation date
5/3/2017 11:07:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
per sq. ft.The potential total building costwould be $1,900,000-$2,100,000. Thisprice does not include the <br />additional sitework and managementcosts, which areanticipated to beas follows: <br />Patio –$100,000 <br />Parking lot expansion-$55,000 <br />Course modifications $25,000 <br />Cart storage $30,000 <br />Utilities-$40,000 <br />Planning and management costs -$285,000(plans and specifications and contract management) <br />Best Value contracting $20,000 <br />Existing fundspreviouslyidentifiedinclude Park Dedicationat$1,300,000, RenewalProgramat $400,000, <br />Golf Course Fundat$200,000for a total of $1,900,000.The Commission engaged in adiscussion of the <br />funding possibilities included a potential levy and bonding. <br />Brokke presentedtwo potential buildingimageoptions. He notedthatahigher ceiling would be preferred in <br />the banquet facility butvarying rooflinesare not desirablefrom a maintenance perspectiveandwould <br />increase the costof the project. <br />Commissioner Heikkila questioned if there could be apotential use of solar panels on the site. Brokke <br />mentionedthat the costfor solarhas historicallyshownlongpaybacks.Commissioner Newby suggested the <br />use of larger windows for solar gain. Commission Chair Gelbach inquired if the design would need to be <br />modified for solar panelsand if that should be considered to accommodate a solar option in the future. <br />Brokke respondedthat load requirements wouldmore than likelyneed to be increased based on the weight <br />of the solar panels and that sustainability efforts would be part of this project.The Commission suggested <br />that the ease of short term and long-term maintenanceshouldbe kept in mind when deciding the design of <br />the new building. <br />Commissioner Baggenstoss askedaboutthe percent difference in cost between the two potential designs. <br />Brokke respondedthat we do not have thatlevel of detail available. <br />Commissioner Heikkila questionedwherethe youthgolfprogram, which hashistoricallybeenheld on the <br />practice green, would be located.McDonagh sharedthat the program could be movedto a different park <br />where a small SNAG Course would be set-up. <br />TheCommission discussed the pros and cons of the potential building forms;focusing on landscape, <br />roofline and skylight options. <br />DEER REDUCTION REPORT REVIEW <br />6. <br />Based on resident concerns of highdeer population in Roseville, the City Council authorized the United <br />States Department of Agriculture (USDA) to complete a deer reduction program in 4 City locations: <br />Central ParkNature Center Area <br />Owasso Hills Park <br />Ladyslipper Park (This Park was baited but no deer were removed) <br />Roseville Leaf Compost Site <br />Twenty deer were removed in one night (1/31/17). The USDA donatedthe meat to needy families.General <br />findings from the reduction effortincluded: <br />70% were female <br />57% of the adult females had 0-1 fetus(A healthy female should be carrying 2 fawns) <br />20% of the deerhad injuries <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.