My WebLink
|
Help
|
About
|
Sign Out
Home
2017-05-08_EDA_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Economic Development Authority
>
Agenda_Packet
>
2017
>
2017-05-08_EDA_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2017 2:09:39 PM
Creation date
6/2/2017 12:03:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br />#¨³¸ ®¥ 2®²¤µ¨««¤ £ 2®²¤µ¨««¤ %¢®®¬¨¢ $¤µ¤«®¯¬¤³ !´³§®±¨³¸ <br />#§¤¢ª«¨²³ ¥®± 0´¡«¨¢ &¨ ¢¨¦ #±¨³¤±¨ <br /> <br />7±¨³³¤ . ±± ³¨µ¤ <br /> <br />Βȁ $¤²¨±¤£ 1´ «¨¥¨¢ ³¨®² ȨͰΓȁΑ ®¥ 0®«¨¢¸ȩ <br /> <br /> ȩ 0±®©¤¢³² ¯±®µ¨£¨¦ §¨¦§ ± ³¨® ®¥ ¯±¨µ ³¤ ¨µ¤²³¬¤³ ³® #¨³¸ ¯´¡«¨¢ ¨µ¤²³¬¤³ ¶¨«« <br />±¤¢¤¨µ¤ ¯±¨®±¨³¸ ¢®²¨£¤± ³¨®ȁ 0±¨µ ³¤ ¨µ¤²³¬¤³ ¨¢«´£¤² £¤µ¤«®¯¤± ¢ ²§Ǿ ¦®µ¤±¬¤³ £ <br />¡ ª «® ²Ǿ ¢®£´¨³ ¡®£²Ǿ ³ · ¢±¤£¨³ ¤°´¨³¸Ǿ £ « £ ¨¥ «±¤ £¸ ®¶¤£ ¡¸ ³§¤ £¤µ¤«®¯¤±ȁ <br /> <br /> <br />The current proposed sources of funds for the project have a very high ratio of private <br />investment to City public investment. The requested City investment is approximately 2.9% of total <br />project costs. The anticipated private investment from government/bank loans and owner/tax <br />credit equity equates to approximately 97.01% of total project costs. <br /> <br />¡ȩ 0±®¯®² «² ³§ ³ ²¨¦¨¥¨¢ ³«¸ ¨¢±¤ ²¤ ³§¤ ¬®´³ ®¥ ¯±®¯¤±³¸ ³ ·¤² ¯ ¨£ ¥³¤± <br />±¤£¤µ¤«®¯¬¤³ ¶¨«« ±¤¢¤¨µ¤ ¯±¨®±¨³¸ ¢®²¨£¤± ³¨®ȁ <br /> <br />The 2017 market value for the site is $1,828,800 with 2016 real estate tax payments in the <br />amount of $66,822. Edison will significantly increase the local tax base when completed. After <br />complete and fully assessed, the estimated market value of the 209 unit development will be <br />$26,970,000 with estimated annual real estate tax payments of $449,980. <br /> <br />0±®¯®² «² ³§ ³ ¤¢®´± ¦¤ ³§¤ ¥®««®¶¨¦ ¶¨«« ±¤¢¤¨µ¤ ¯±¨®±¨³¸ ¢®²¨£¤± ³¨®ȁ <br /> <br /> As described in prior narratives, the Edison proposal will encourage the following <br />priorities: <br /> <br /> <br />b) provides significant improvement to the surrounding land uses and the <br />neighborhood (spin-off development); <br /> <br />d) promotes multi-family housing investment and meets the following City goals: <br />(ii) demonstration of need for the type of multi-family housing proposed through a <br />$¤³¤±¬¨¨¦ !¥¥®±£ ¡«¤ (®´²¨¦ .¤¤£¤£ <br />market study or other reliable market data ( <br />¨ ³§¤ 4¶¨ #¨³¨¤² ΕΓΔΔ ΕΓΕ 2¤¯®±³ <br />); (iii) multi-family workforce housing proposals <br />that include amenities similar to those found in market rate housing (underground <br />parking, large units, in unit washer/dryer, balconies/decks, recreation area, <br />community room, resident storage, leasing office); <br /> <br />©ȩ !££¨³¨® ®¥ ²¯¤¢¨¥¨¢ ¯±®©¤¢³ ¤§ ¢¤¬¤³² ¨¢«´£¨¦Ǿ ¡´³ ®³ «¨¬¨³¤£ ³®Ȁ <br /> ±¢§¨³¤¢³´± « ´¯¦± £¤²Ǿ ¯¤£¤²³±¨ £ ³± ²¨³ ¢®¤¢³¨®²Ǿ ¦±¤¤ ¡´¨«£¨¦ ¯± ¢³¨¢¤² £ <br />¤§ ¢¤£ ²¨³¤ ¯« ¨¦ ¥¤ ³´±¤²ȁ <br /> <br />Pedestrian and Transit Connections. Edison will incorporate a 1,730 lineal foot gravel <br />walking trail around the perimeter of the site that will be open to the public. Connections to the trail <br />for Edison residents will be at various locations throughout the development while trail access for <br />the public will be from two locations along Old Highway 8. <br /> <br />Edison will also create a link from Sandcastle Park with a pedestrian crossing at Old <br />Highway 8 to a newly constructed public sidewalk which will take pedestrians north to the Edison <br />walking trail. This will further link to transit via a new public sidewalk along Old Highway 8 to the <br />Metro transit stops on County Road D. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.