My WebLink
|
Help
|
About
|
Sign Out
Home
2017-06-27_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017-06-27_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2017 9:38:24 AM
Creation date
6/28/2017 9:33:35 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/27/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: June 27, 2017 <br />Item Description: Communication Items <br />Item No: 4 <br />Public Works Project updates: <br />• Twin Lakes Parkway Phase III and Twin Lakes Area Signals: Extension of Twin Lakes <br />Parkway from Prior Ave to Fairview Ave and construction of traffic signal at Fairview <br />Ave. and Twin Lakes Parkway. <br />o All work on the project is completed, including the new traffic signal and the <br />restriping of Fairview Avenue. The two storm water basins near Arthur Street <br />were planted with bee friendly pollinator plants. <br />• Cleveland Lift Station: Lift station replacement project at Cleveland & Brenner. <br />o The contractor has begun the forcemain work associated with this project and will <br />begin installing the new lift station the week of June 26. Traffic on Cleveland will <br />be reduce to one lane in each direction for the next month until the new lift station <br />is completed. <br />• 2017 Lining Project <br />o Estimated to line 5.5 miles of sanitary sewer main and 0.1 miles of storm sewer <br />o Contractor started work in March and is 30% complete. <br />• Larpenteur Sidewalk <br />o Work involves the construction of new sidewalk on the north side of Larpenteur <br />Ave between Mackubin St and Galtier St. <br />o The new sidewalk work is completed and the sidewalk is open to the public. <br />• 2017 Railroad Crossing Improvements <br />o Work involves replacement of railroad crossings on Terminal Road and Walnut <br />Street. <br />o Two of the three railroad crossing locations have been completed. The third <br />railroad crossing on Terminal Road just west of St Croix St will begin June 26. A <br />detour will be in place for the next two to three weeks until the project is <br />completed. <br />South Lake Owasso Drainage Improvement <br />o Work on the installation of the PaveDrain permeable paver system is almost <br />completed. <br />Dale Street Parking Lot <br />o Work involves the complete replacement of the parking lot for the soccer fields <br />located off Dale St just south of County Road C. <br />o The parking lot is partially finished and is open for Rose Fest. The remaining <br />work on the lot will be finished in the next two weeks. <br />2017 Pavement Management Project <br />o This year's project involves 7 miles of street resurfacing, 1 mile of watermain <br />replacement and various storm sewer upgrades. <br />
The URL can be used to link to this page
Your browser does not support the video tag.