Laserfiche WebLink
TH 280: BROADWAY ST <br />RAMSBY COUNTY <br />Interchange: TH 35W <br />1. TH 280 & BROADWAY ST <br />Entering ADT: 47,800 <br />Priority: HIGH <br />50 <br />rvx <br />Interchange: HENNEPIN AVE <br />b <br />C <br />b <br />C <br />Legend <br />e <br />r __ <br />I <br />h- <br />i <br />This intersection has an entering <br />volume nearthe middle <br />I_ <br />t <br />I <br />ofthe study's <br />t I <br />y – <br />i - ¢ I. <br />M <br />• I <br />I <br />Y <br />`– <br />I <br />range and a high-priority ranking. The <br />capacity analysis indicates possible <br />need for high-capacrfy at -grade <br />Grade-Separation Priority <br />nie hangs <br />169 0 J <br />_ <br />I �. <br />r <br />improvements or a grade separation. <br />HIGH <br />® <br />=]_ t <br />I <br />O MEDIUM <br />u <br />H <br />Intemecdon <br />Spacing <br />ij <br />} <br />— -- <br />---� <br />_ <br />! n- <br />Figure 28 <br />40 LOW <br />- <br />Facus Area <br />t <br />CD <br />6 M <br />I <br />Ramsey County - TH 280 <br />o <br />0.25 <br />�� <br />to�_ <br />f <br />I <br />Focus Area <br />Miles <br />L t Ir� <br />L I, <br />3 <br />I <br />L — <br />Source:MelmGIS,MnDOT <br />52J I <br />January 2017 <br />i <br />r <br />January 2017 KI.i," , .aTc "`- Page 60 <br />INTERSECTION iii <br />rV'trTWM, CONVERSION STUDY.:ui,i..."oe <br />