My WebLink
|
Help
|
About
|
Sign Out
Home
2017_0613_FC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Finance Commission
>
Packet
>
2017_0613_FC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2017 1:46:53 PM
Creation date
7/14/2017 1:41:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department/Division: General Facilities: Skating Center <br />Project/Initiative Title: Replace One of Three OVAL Micro Processors <br />Total Estimated Cost: $20,000 <br />Funding Source: General Facilities Fund (property tax) <br />Annual Operating Budget Impact: N/A <br /> <br /> <br /> <br />Project/Initiative Description: <br />Microprocessors are automatic control mechanisms for the OVAL compressors. The replacement of the <br />microprocessor is important to help run the compressors more efficiently. The original control pads are <br />outdated and are nearing the end of their useful life. This mechanism works to control the operation of the <br />compressors. There is one processor on each of the three compressors. One has been replaced. The goal <br />is to replace the other two over the next couple of years. These were originals in 1993, parts are becoming <br />more difficult and expensive to obtain. <br /> <br /> <br />Location: <br />OVAL Mechanical Room. <br /> <br />Item 7: Attachment A <br />23
The URL can be used to link to this page
Your browser does not support the video tag.