Laserfiche WebLink
Major Maintenance Activities: <br />• Completed third mowing of rights-of-way and maintained various streetscapes. <br />• Completed annual painting of pavement markings. <br />• Ongoing street patching, monthly compost turning, tree trimming, and storm sewer <br />cleaning/repairs. <br />• Continue working on meter repairs and replacements. <br />• Collected bacteriological samples for testing. <br />• Continued working with consulting engineers on the Booster, Walsh Pond and Cleveland <br />lift stations for future work. <br />• Repaired one broken water main. <br />• Continued with the annual sanitary sewer cleaning program <br />• Repaired hydrants the seasonal staff are found issues with while they were flushing. <br />• Seasonal employees continued flushing fire hydrants and cutting grass around lift stations <br />and water towers. Staff will be following up flushing and hydrant repairs with painting <br />many of the hydrants in the public righ-of-way. <br />• Flushed and inspected private hydrants at the request of the property owner, which will <br />be charged a fee for the service. <br />Attachments: <br />A: 2017 Project Map <br />B: Development Activity Report <br />C: Water Booster Station Site Plan <br />