My WebLink
|
Help
|
About
|
Sign Out
Home
2017_07-25_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_07-25_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 11:34:25 AM
Creation date
12/8/2017 11:33:03 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/25/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pathway Master Plan Update <br />2008 Master Project List - Status Update July 2017 <br />Page 2 of 2 <br />Project Name <br />Description <br />18 <br />Victoria Street south of B - Complete 2015 <br />Develop an on- road and off-road pathway from Larpenteur Ave to County Road B <br />19 <br />Dale Street North - Complete 2011 <br />The construction of an off-street trail from S. Owasso Blvd to County Road C. <br />20 <br />Dale Street South <br />The construction of an off-street trail from Reservoir Woods Park to Larpenteur <br />Avenue. <br />21 <br />Rice Street <br />Develop an on- road and off-road pathway from Larpenteur to the north City <br />boundary. <br />22 <br />Brenner to Langton Connection - Complete <br />Develop a pathway connection between Brenner Ave and Langton Lake Park. <br />2011 <br />23 <br />Langton Lake Loop <br />Develop a pathway that goes around all of Langton Lake. <br />24 <br />Twin Lakes Redevelopment Area Connections - <br />Develop pathway facilities, both on and off road, as a part of public street <br />Complete 2009, 2010, 2016, 2017 <br />infrastructure project within Twin Lakes Redevelopment area (between Fairview <br />and Cleveland). Provide connection from the redevelopment area into Langton <br />Lake Park. <br />25 <br />NE Diagonal RR Connection (Walnut to Co Rd <br />Develop a trail connection between Cleveland Avenue and Walnut Street along <br />C) <br />County Road C or along the Railroad right- of- way south of County Road C. <br />26 <br />Rosedale to HarMar Connection <br />A light traffic overhead bridge structure across Highway 36 and pathway <br />connection between Rosedale and Har Mar Mall. <br />27 <br />Heinel Drive Connection <br />Develop a pathway connection between S. Owasso Blvd and County Road C along <br />Heinel Drive <br />28 <br />Judith to Iona Connection <br />Develop a pathway connection between Judith Ave and Iona Lane. <br />29 <br />Lovell to Minnesota Connection <br />Develop a pathway connection between Lovell Ave and Minnesota Street. <br />30 <br />Villa Park Connections <br />Develop a pathway connection from Shryer Ave and from Ryan Ave into Villa <br />Park <br />31 <br />Millwood to County Road C2 Link <br />Develop a pathway connection that creates a link between the corner of Millwood <br />and Chatsworth through the Ramsey County open space to County Road C2. <br />32 <br />Eustis to St. Croix Connection <br />Develop a pathway connection between Eustis Street and St. Croix Street. <br />33 <br />Cohansey St to HANC Connection <br />Develop a pathway connection between Cohansey Street and HANC. <br />34 <br />Alta Vista Drive <br />Develop a pathway connection along Alta Vista Drive between Larpenteur Avenue <br />and Reservoir Woods Park. <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.