My WebLink
|
Help
|
About
|
Sign Out
Home
2017_08-22_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_08-22_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 11:37:45 AM
Creation date
12/8/2017 11:36:07 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/22/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minnesota Department of Transportation updates: <br />• Snelling Avenue Project —Resurfacing project between Como Ave and TH 36. <br />o Creation of additional turn lanes at Larpenteur and County Road B. <br />o Scheduled to be completed by the State Fair. <br />35W Managed Lane Project—This project, which will add aMnPASS (toll)/carpool lane <br />to 35W from County Road C to Lino Lakes, has been fully funded and will go out for <br />bids late next summer. This will be a design/build project where the contractor uses a <br />consultant to finish the final design of the project and is then responsible for constructing <br />that design. Construction is expected to begin in the spring of 2019 and likely last four <br />years. <br />MnDOT has recently hired a consultant to start the preliminary study for adding a <br />managed lane to Highway 36 from 35W to 35E, at least in the eastbound direction. There <br />is still ongoing discussion about whether a third lane will be added to the westbound <br />direction or not. There is no set timeline for actual construction of this project as it has <br />not yet been fully funded. <br />Major Maintenance Activities: <br />• Completed fourth mowing of rights-of-way and maintained various streetscapes. <br />• Completed annual painting of pavement markings. <br />• Ongoing street patching, monthly compost turning, tree trimming, and storm sewer <br />cleaning/repairs. <br />• Continue working on meter repairs and replacements. <br />• Collected bacteriological samples for testing. <br />• Continue working with consulting engineers on the Booster, Walsh Pond and Cleveland <br />lift stations for future work. <br />• Repaired one broken water main and replaced two valves. <br />• Continue with the annual sanitary sewer cleaning program. <br />• Began hydrant painting. <br />Attachments: <br />A: 2017 Project Map <br />B: Development Activity Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.