My WebLink
|
Help
|
About
|
Sign Out
Home
2017_08-22_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_08-22_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 11:37:45 AM
Creation date
12/8/2017 11:36:07 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/22/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pathway Master Plan Update <br />Master Project List - August 2017 <br />Map <br />Project Name <br />Description <br />Ref <br />1 <br />County Road D <br />Develop pathway facilities, both on- and off-road, between Cleveland Avenue and <br />Fairview Avenue. <br />2 <br />County Road C-2 West of Snelling Avenue <br />Develop both on -and off-road pathways within the County Road C-2 alignment from <br />the west City Boundary to Snelling Avenue. This corridor would include a <br />pedestrian bride across I -35W. <br />3 <br />County Road C-2 East of Snelling Avenue <br />Complete both on- and off-road pathways within the County Road C-2 alignment <br />from the Snelling Avenue to Victoria Street. <br />4 <br />County Road C <br />Construct an on -road pathway from Lexington Avenue to Rice Street. <br />5 <br />County Road C Sidewalk <br />Construct a sidewalk on the north side of County Road C from Western Avenue to <br />Rice Street. <br />6 <br />County Road B <br />Complete off-road pathway segments from Highway 280 to Rice Street. <br />7 <br />Roselawn Avenue <br />Develop both on -road and off-road pathways from TH 280 to Lexington Avenue. <br />8 <br />Cleveland Avenue <br />Complete off-road pathway segments between County Road C and County Road D. <br />9 <br />Fairview Avenue (north of B-2) <br />Development of both on -road and off-road pathways between County Road B-2 and <br />County Road D. <br />10 <br />TH 51 connection to Old Snelling Avenue <br />Work with Arden Hills to develop a regional pathway connection along Snelling <br />(Arden Hills) <br />Avenue to Old Snelling Avenue in Arden Hills connecting Roseville to Mounds <br />View High School, Valentine Hills Elementary School, Bethel College, Lake <br />Johanna Park and County Road E2 commercial businesses. <br />11 <br />Hamline Avenue <br />An off-road trail from County Road B-2 to TH 51 (Snelling Avenue). <br />12 <br />Lexington Avenue <br />Complete off-road pathway on the east side of Lexington Avenue from Larpenteur <br />Avenue north through the City connecting to Shoreview's pathway system. <br />13 <br />Victoria Street north of C <br />Develop an on- road and off-road pathway from County Road C to County Road D. <br />14 <br />Dale Street South <br />The construction of an off-street pathway from Reservoir Woods Park to Larpenteur <br />Avenue. <br />15 <br />Rice Street <br />Complete an on- road and off-road pathway from Larpenteur Avenue to the north <br />City boundary. <br />16 <br />Langton Lake Loop <br />Develop a pathway that goes around all of Langton Lake. <br />17 <br />NE Diagonal RR Connection <br />Develop a pathway connection between Cleveland Avenue and Walnut Street along <br />(Walnut to Co Rd C) <br />County Road C or along the Railroad right-of-way south of County Road C. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.