My WebLink
|
Help
|
About
|
Sign Out
Home
2017_09-26_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_09-26_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 12:10:59 PM
Creation date
12/8/2017 11:43:28 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/26/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: September 26, 2017 <br />Item Description: Communication Items <br />Item No: 4 <br />Public Works Project updates: <br />• 2017 Pavement Management Project <br />o This year's project involves 7 miles of street resurfacing, 1 mile of watermain <br />replacement and various storm sewer upgrades. <br />o The project is approximately 70% completed. <br />• Water Booster Station Update and Water Model <br />o Bids for this project were opened on August 22, 2017. The City received two bids <br />and, based on Best Value scores, awarded a contract to Municipal Builder, Inc. in <br />the amount of $748,500, and an overall technical score of 94.25. The engineer's <br />estimate for this proj ect was $1,206,5 51. <br />o This phase includes a new emergency generator and new electrical equipment. <br />Lift Station Project <br />o Staff began the design process with its consultants on upgrading the Walsh storm <br />water lift station and upgrading the Lounge sanitary lift station. <br />Ramsey County updates: <br />• Ramsey County will be resurfacing Cleveland Ave between Iona St and County Road D. <br />Work is anticipated to be completed toward the end of October. <br />Minnesota Department of Transportation updates: <br />• Snelling Avenue Project — Resurfacing project between Como Ave and TH 36. <br />o This project is substantially complete with some minor finishing items remaining <br />that will have some short term, limited, impact on traffic. <br />• MnDOT is finalizing plans to perform pavement maintenance on 35W south of TH 36 in <br />2018. There will be impacts to some ramps in Roseville including the Cleveland <br />Ave/County Road B ramps and access to TH 280. Staff will bring more information on <br />this project to Commission as details are made available. <br />Major Maintenance Activities: <br />• Over half through City on third sweep of the year. Will have one more Citywide sweep at <br />peak of leaf out. <br />• Maintenance staff will begin replacing all City street name signs this fall and into the <br />winter. All signs will now have the Roseville rose and have maximum retro reflectivity <br />for visibility. <br />• Reclaimed trails at Rosebrook Park and added segment on north side of park to complete <br />a loop around the entire park. <br />• Ongoing street patching, monthly compost turning, tree trimming, and storm sewer <br />cleaning/repairs. <br />• Continue working on meter repairs and replacements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.