My WebLink
|
Help
|
About
|
Sign Out
Home
2017_11-28_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_11-28_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 2:22:52 PM
Creation date
12/8/2017 2:14:29 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/28/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As the owners of the transportation network in Roseville (i.e. City of Roseville, Ramsey County, <br />MnDOT, and the MNNR) advance their respective Capital Improvement Programs (CIPS), this <br />Plan is intended to serve as an important resource and reference in establishing priorities and <br />advancing transportation projects for implementation. Advancing these projects from a <br />planning to implementation phase will require collaborative discussions among facility owners, <br />adjacent communities, the Metropolitan Council, residents and others to conduct traffic studies, <br />finalize designs, preserve rights-of-way, obtain environmental clearances and leverage <br />necessary financial resources. Figure 19 on the following page outlines the entire planning and <br />project development process required for transportation projects from concept plans to <br />construction implementation. <br />ChapterX—Transportation (DRAFT) <br />Adopted XXXXXXXX XX, 2017 <br />Page X-69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.